KPA_SERIES_ACTIVE.DOC
24/35
DANGER
Impact hazard.
Impact hazard.
Secondary attachment for
overhead installation! Ne-
ver suspend this system!
Danger to life due to cra-
shing speaker-systems.
Secondary attachment for
overhead installation! Ne-
ver suspend this system!
Danger to life due to cra-
shing speaker-systems.
Loud noise
hazard.
Loud noise
hazard.
WARNING
Ear protection
must be worn.
Ear protection
must be worn.
Fire hazard.
Fire hazard.
CAUTION
Keep away cigarettes,
open fire, heaters etc.
Treat the surface with
fire retardant in regular
intervals.
Keep away cigarettes,
open fire, heaters etc.
Treat the surface with
fire retardant in regular
intervals.
LEGAL INSTRUCTIONS
Operating an amplification system can produce extremely high noise levels that may cause a permanent
hearing loss. The legal instructions for using an amplification system vary from country to country. The user
must always inform himself on the legal instructions valid in his country and apply them to his situation.
Always monitor the sound pressure level when operating an amplification system in discotheques, concerts
etc. Never exceed the permissible noise level exposures as specified by your authorities. The monitoring of
the noise levels must be documented in an appropriate way.
In Germany, the follwing instructions are binding:
Strafgesetzbuch § 223 ff:
http://bundesrecht.juris.de/bundesrecht/stgb
TA Lärm:
http://www.umweltdaten.de/laermprobleme/talaerm.pdf
DIN 15905-5:
www.din.de
Arbeitsstättenverordnung § 15
http://www.lfas.bayern.de/vorschriften/verordnungen/a_z/arbstaettv.htm
Berufsgenossenschaftliche Vorschrift BGV B3:
http://www.pr-o.info
VDI-Richtlinie: VDI 2058 Blatt 2:
www.vdi.de
Hearing damage caused by high noise levels can be treated as physical injury and persecuted by law.
Please note that the organizer is responsible for keeping to a specified noise level. If this noise level will be
exceeded, the event may be cancelled immediately.
If the organiser does not fulfill his safety duties, he is reliable by civil law for any damages occured, e.g.:
Pay the treatment costs of the damaged person.
Pay a smart money to the damaged person.
Economic damage caused can be demanded from the operator of the amplification system.
If hired persons work with amplification systems: the noise levels of music events are almost always too high.
This is why the entrepreneur has to set up warning signs and provide hearing protectors. The staff has to
use these.