![Omnicomm LLS 5 Скачать руководство пользователя страница 8](http://html2.mh-extra.com/html/omnicomm/lls-5/lls-5_user-manual_4035521008.webp)
Sensor Preparation
1. Cut the sensor measuring part according to the following recommendations:
The length of the sensor measuring probe should be 20mm less than the depth of the
tank.
The REF channel must be at least 100 mm shorter that the measuring part of the
sensor. If the difference is less than 100 mm, trim the REF channel according to the
figure:
2. Install the central partition into the sensor measuring part at the depth of 1 cm.
Cut the REF channel (only if the length of the REF channel and the measuring part is
less than 100 mm):
1. Install the central partition in the REF channel in close proximity to the cut point.
2. Cut with a cutting wheel (max. 125 mm in diameter)
3. Remove a section of the REF channel rod
The REF channel rod is shorter than the main measuring rod and is located on the right
when looking at the sensor body on the connector side.
8
Preparation
Содержание LLS 5
Страница 1: ...Omnicomm LLS 5 Fuel Level Sensor User Manual 02 10 2020...
Страница 10: ...Omnicomm Configurator PC The fuel level value is displayed without filtering 10 Setting...
Страница 23: ...23 Fuel Level Sensor Installation Recommendations for Cylindrical Fuel Tanks...
Страница 25: ...15 Seal tie 1 Name Quantity 25 Appendix List of equipment for Omnicomm LLS fuel level sensors installation...
Страница 26: ...info omnicomm world com www omnicomm world com...