
5
20160
602
Installation
1)
2)
Connecting several condensate collecting points to one condensate drain device causes operating
problems (1). Make sure that each condensate collecting point has its own condensate drain (2).
After installation or maintenance, the test button should be pressed to empty condensate that has
been collected while the ball valve has been closed.
Electrical installation
Recommended wire lengths (mm)
230V/115V
24Vdc
1
Neutral
+24Vdc
2
Line
0V
3
Protective Earth
Electrical connection should be made as shown above. It depends on orientation of the cover.
Be careful not to pinch wires by cover!
Be careful to clamp all strains of wires into respective terminal blocks (use ferrules)!