background image

 

Components 

 

 

 

 

 

 

 

 

 

  Assembly kit DUAL 

2x Stud bolt 

1x  O-ring sealing 

4x  Cap nut 

4x   Spring washer 

  Assembly kit TRIPLE 

2x Stud bolt 

2x  O-ring sealing 

4x  Cap nut 

4x   Spring washer 

Содержание AK AAF Series

Страница 1: ...F Please read the following instructions carefully before installing assembly kit into service Trouble free and safe operating of the assembly kit can only be guaranteed if recommendations and conditi...

Страница 2: ...tors When connecting filters through with nipples are often happens during the installation of the filters group on the pipeline the weight of the filters can be rotated and are no longer in line cons...

Страница 3: ...3 Components Assembly kit DUAL 1 2x Stud bolt 2 1x O ring sealing 3 4x Cap nut 4 4x Spring washer Assembly kit TRIPLE 1 2x Stud bolt 2 2x O ring sealing 3 4x Cap nut 4 4x Spring washer 1 2 3 4...

Страница 4: ...equipment Ensure that installation complies with local laws for operation and routine testing of pressure equipment at the place of installation The operator user of the assembly kit should make hims...

Страница 5: ...se original spare parts only Use the device for appropriate purpose only There shouldn t be any tension between assembly kit and installation Assembly kit shouldn t be subject to any stress vibration...

Страница 6: ...ep as is the outer diameter of the thread We need to prepare two pieces of studs 2 In the next step on the studs which was prepared in the previous step we installed components as shown below fig When...

Страница 7: ...s it is necessary to tighten the nuts with specified torque The torque value is defined in the table beside the fig It is very recommended that all nuts 3 are equally a deep screwed into studs 1 Type...

Страница 8: ...ep as is the outer diameter of the thread We need to prepare two pieces of studs 4 In the next step on the studs which was prepared in the previous step we installed components as shown below fig When...

Страница 9: ...checks of filter integrity are strongly recommended for safe operation Carry out a check for leaks once the maintenance work has been finished Warranty exclusion The guarantee shall be void if The ope...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...12 OMEGA AIR d o o Ljubljana Cesta Dolomitskega odreda 10 SI 1000 Ljubljana Slovenia Tel 386 0 1 200 68 00 Fax 386 0 1 200 68 50 E mail info omega air si www omega air si...

Отзывы: