ratio. Moreover, in order to better use the machine, the product inside the pool has to be higher than at a 

minimum level which coincides more or less with the position of the mixer axle.

USEFUL ADVICE IN ORDER TO OBTAIN A GOOD DOUGH

Any kind of flour can be used (bran or bran flour). The dough can be kneaded only with eggs or with a mix 

of water and eggs. Water can be partially replaced by spinach or well cut vegetables in order to obtain green 

noodles. Because the flour’s humidity changes according to the kind used, the environment and the place 

where it is stocked, the quantities indicated have to be adapted to the kind of flour which is used, lowering or 

increasing the quantity of water. The dough is the right one when, at the end of kneading process, it is as big 

as coffee beans. If the lumps form in the flour you have poured in too much liquid. In this case, before turning 

the switch FROM KNEADING (Fig.4 A) TO DRAWING (Fig.4 B) you will have to add some more flour and 

knead a little longer. If the flour does not form a ball and is too floury, add some more water. For the dough for 

the sheet of pasta which is to be re-kneaded, use “00” flour and add two eggs per kilo of flour (maximum). With 

these quantities you will obtain a very stretchy dough which is easy to knead.

QUANTITIES IN ORDER TO OBTAIN A GOOD DOUGH

• 

Supposed weight of an egg: 50 grams.

• 

If you take 1 egg away you need to add 50 grams of water.

•  To obtain a good dough: 1 kg of flour + 350 grams of humidity-liquid.

Close the cover or the hopper, position the general switch to “1” (Fig.5 A) and put the selector on position 

(Fig.6 A). Push the start button (Fig.6 B). Add the liquid part pouring it gradually but as quickly as possible 

through the small hole in the cover. At the end of the kneading operation, which should take around 10 

minutes, make sure the product has the right thickness and should look like coffee beans (check through the 

small holes of the cover). Turn the machine off by switching the selector to “0” (Fig.6 A).

INSTALLATION OF THE DRAWPLATE AND START-UP OF PRODUCTION

Make sure the machine is switched off.

Withdraw the drawplate and the filter requested from the container filled with water where it  was put  after 

its last  use. Thoroughly rinse with plenty of running, warm water, in order to have the piece at the right 

temperature (see CLEANING). Dry it with a soft cloth. Unscrew the blocking ring nuts (Fig.7 A) and carefully 

clean the internal part including the edging. Take the plastic cap off (Fig.7 B). Set up the filter and the hopper 

while taking good care of the Archimedean screw frame at the center of the filter disk and drawplate (Fig.9 A 

and B). Close the metal ring with the help of the wrench supplied (Fig.8 A) and check that all the pieces are in 

the right places and not axially moved (see correct setting up procedure of the Archimedean screw). In order 

to start production, position the selector on the position 

(Fig.6 A) and push the start button (Fig.6 B). The 

initial product coming out of the machine has an unacceptable appearance; this is the reason why it has to be 

eliminated. After a short time (a couple of minutes) the product coming out is acceptable, the colour goes from 

whitish to yellow and it has a greater consistency.

In order to cut the pasta to the desired length it is necessary to set up the cutting device, made up of motor and 

knife, chosen from those available.

Содержание PM-IT-0080

Страница 1: ...Revised 08 21 2017 Toll Free 1 800 465 0234 Fax 905 607 0234 Email service omcan com www omcan com Pasta Machine Model PM IT 0080 Item 13286 Instruction Manual...

Страница 2: ...25 26 30 31 Table of Contents Section General Information Safety and Warranty Technical Specifications Installation Operation Maintenance Troubleshooting Figure Drawings Parts Breakdown Electrical Sch...

Страница 3: ...e It s of the utmost importance to save these instructions for future reference Also save the original box and packaging for shipping the equipment if servicing or returning of the machine is required...

Страница 4: ...io y no bajo alguna influencia de droga o alcohol y que este ha sido entrenado en el correcto funcionamiento de esta m quina y sta usando ropa apropiada y autorizada Cualquier modificaci n a la m quin...

Страница 5: ...circuits Carry out all phase connections as well as any neutral and ground connections compulsory with a standard plug compatible with the above mentioned socket The protection lead ground is the one...

Страница 6: ...ity The lifting and positioning of the machine must be carried out by at least two people To position the machine definitively or when moving it for cleaning insert the tip of the lever in its proper...

Страница 7: ...e system WARNING Have the plug fitted to the power supply by qualified personnel Take the necessary precautions to prevent the cable from being crimped or damaged INSTALLING THE CUTTING GROUPS Both cu...

Страница 8: ...our local authorised dealer or concessionaire for repairs Only after making sure that the machine is completely clean especially all the parts which are directly in contact with the product extrusion...

Страница 9: ...position Fig 6 A Push the start button Fig 6 B Add the liquid part pouring it gradually but as quickly as possible through the small hole in the cover At the end of the kneading operation which should...

Страница 10: ...t while it is in the stop position Position the cutting group Fig 12 A after having released the handwheel Fig 13 A in front of the drawplate Fig 12 D paying attention that the knife Fig 12 C moves ax...

Страница 11: ...NG DRAWING and the other control buttons on the 0 position Rotate the cutting group to the stop position Fig 8 Put the selector on the mixture position for 10 15 seconds in order to eliminate the pres...

Страница 12: ...Clean coated surfaces with soft cloth and disinfect with alcohol For the inside parts of the machine take off the bigger back panel Fig 33 A and carry out the cleaning of the machine bearing in mind t...

Страница 13: ...6 B For this reason disassemble the left hand side panel Fig 36 C from the machine and make sure that the belt is tight enough If necessary use the regulating system by moving the motor and therefore...

Страница 14: ...crease the quantity of water in order to respect the aforementioned percentage The product does not come out of the drawplate The blocking of the drawplate because of dried dough Disassemble and clean...

Страница 15: ...15 Figure Drawings...

Страница 16: ...16 Figure Drawings...

Страница 17: ...17 Figure Drawings...

Страница 18: ...18 Figure Drawings...

Страница 19: ...19 Figure Drawings...

Страница 20: ...20 Figure Drawings...

Страница 21: ...21 Figure Drawings...

Страница 22: ...22 Parts Breakdown Model PM IT 0080 13286...

Страница 23: ...23 Parts Breakdown Model PM IT 0080 13286...

Страница 24: ...24 Parts Breakdown Model PM IT 0080 13286...

Страница 25: ...62527 Pinion Duct for TR150 8 62545 Mobile Mixer Support for TR150 26 62563 Distance for TR150 44 62528 Chain for TR150 9 62546 Bearing for TR150 27 62564 Wheel for TR150 45 62529 Idler Chain for TR1...

Страница 26: ...26 Electrical Schematics Model PM IT 0080 13286...

Страница 27: ...27 Electrical Schematics Model PM IT 0080 13286...

Страница 28: ...28 Electrical Schematics Model PM IT 0080 13286...

Страница 29: ...29 Electrical Schematics Model PM IT 0080 13286...

Страница 30: ...30 Electrical Schematics Model PM IT 0080 13286...

Страница 31: ...er online by visiting OMCAN PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada L5L 4X5 www omcan com warrantyregistration html or email to service omcan com Purchaser s In...

Страница 32: ...relations avec nos clients et les fabricants de valeur Aujourd hui avec des partenaires en Am rique du Nord Europe Asie et Am rique du Sud nous travaillons continuellement am liorer et d velopper l e...

Отзывы: