background image

7

Installation

6”(150 mm) from all sides. This equipment must be a distance of 6”(150 mm) from other equipment. The 

equipment must have the 4”(100 mm) legs installed and be placed on a non-combustible surface.

Air Supply and ventilation:

•  The area in front and around the equipment must be kept clear to avoid any obstruction of the flow of 

combustion and ventilation air.

•  Adequate clearance must be maintained at all times in front of and at the sides of the equipment for 

servicing and proper ventilation.

Before initial use, turn the gas control knob to the maximum setting and allow the equipment to burn-in for 15 

minutes. Seeing smoke coming from the cooking surface is normal during burn-in. After 15 minutes of burn-in, 

equipment is ready for use.

1.  Hold the leg and rotate the adjustable feet so the equipment is level.

2.  Set the grill grates to the full tilt position to start. This will allow grease to run down the grates and into the 

drip tray to reduce flare-ups.

3. 

Check the drip tray frequently and add water as necessary.

4.  To ignite the burners, press the gas control knob to high position.

5. 

Allow the equipment to pre-heat before attempting to use.

6.  Adjust the valve set-point to obtain the desired level of heat.

7.  To adjust the grill grate(s), raise or lower the back of the grates. Turn unit off and allow the grill grate(s) to 

cool. Make sure to use pot holders or oven gloves to reposition.

Pressure Regulator:

•  All commercial cooking equipment must have a pressure regulator on the incoming service line for safe and 

efficient operation.

•  Regulator specifications: ¾” NPT inlet and outlet, factory adjusted for 5” WC Natural Gas standard and may 

be converted by qualified personnel to be used for Propane at 10” WC.

Prior to connecting the 

regulator, check the incoming 

line pressure. The regulator 

can only withstand a maximum 

pressure of ½ PSI (14” WC).  

If the line pressure is beyond 

this limit, a step down regulator 

will be required. The arrow on 

the bottom shows gas flow 

direction and should point 

downstream to the equipment

.

4”(100 mm)

Содержание CE-CN-1219-G

Страница 1: ...Gas Counter Top Griddles Model CE CN 1219 G Item 37524 Instruction Manual Revised 12 05 2016 Toll Free 1 800 465 0234 Fax 905 607 0234 Email service omcan com www omcan com...

Страница 2: ...16 18 19 Table of Contents Section General Information Safety and Warranty Technical Specifications Installation Operation Maintenance Troubleshooting Instructions for Field Conversion Parts Breakdown...

Страница 3: ...e It s of the utmost importance to save these instructions for future reference Also save the original box and packaging for shipping the equipment if servicing or returning of the machine is required...

Страница 4: ...funcionamiento de esta m quina y sta usando ropa apropiada y autorizada Cualquier modificaci n a la m quina an la la garant a y puede causar da os a las personas usando la m quina mientras esta en el...

Страница 5: ...ou smell gas follow the instructions provided by the gas supplier Do not touch any electrical switch do not try to light the burner do not use a telephone within close proximity Never attempt to move...

Страница 6: ...off the gas shut off valve Allow the appliance to vent for five minutes before attempting to re light INSTALLATION TO BE DONE BY LICENSED GAS PROFESSIONALS ONLY SET UP 1 Remove all packing material an...

Страница 7: ...grates and into the drip tray to reduce flare ups 3 Check the drip tray frequently and add water as necessary 4 To ignite the burners press the gas control knob to high position 5 Allow the equipment...

Страница 8: ...down the equipment Pilot Flame Regulation The pilot flame on the equipment has been factory adjusted When adjustment is necessary adjust the pilot flames as small as possible but high enough to light...

Страница 9: ...A manual shut off valve should be installed upstream from the manifold within 4 ft 1 2m of the equipment and in a position where it can be reached in the event of an emergency Check entire gas piping...

Страница 10: ...and reinstall in griddle 7 Wipe down exterior of griddle cabinet with a clean cloth and non abrasive cleanser Rinse thoroughly with water and a clean cloth Dry with a soft clean cloth Troubleshooting...

Страница 11: ...justment Contact qualified technician for adjustment Damaged temperature control burner or other internal component Contact Authorized Omcan Service Agency for repairs REFERENCE Item Number Model Numb...

Страница 12: ...an cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing or servicing equipment WARNING This conversion kit shall be installed...

Страница 13: ...ot in the support bracket Secure by replacing the M5 nut 7 To operate with LP gas the regulator must be changed to operate at 10 WC or use a LP regulator 8 Prior to connecting the regulator check the...

Страница 14: ...peration and shall not be changed for operation at elevations up to 2000 ft 600m For operation at elevations above 2000 ft 600m equipment ratings shall be reduced at the rate of four 4 percent for eac...

Страница 15: ...15 Parts Breakdown Model CE CN 1219 G 37524...

Страница 16: ..._______________ ________________________________________________________________________________________ ________________________________________________________________________________________ ______...

Страница 17: ..._______________ ________________________________________________________________________________________ ________________________________________________________________________________________ ______...

Страница 18: ..._______________ ________________________________________________________________________________________ ________________________________________________________________________________________ ______...

Страница 19: ...er online by visiting OMCAN PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada L5L 4X5 www omcan com warrantyregistration html or email to service omcan com Purchaser s In...

Страница 20: ...relations avec nos clients et les fabricants de valeur Aujourd hui avec des partenaires en Am rique du Nord Europe Asie et Am rique du Sud nous travaillons continuellement am liorer et d velopper l e...

Отзывы: