Page
8 from
10
940813000_09_0
1
2
(The following procedure must be done with the
main power supply isolated)
Retaining screw
entrance
Retaining screw
entrance
Alignment
vial
Pre-etched entrance
for the connection cable
(
must be removed before thermostat’s installation
)
Photo
1
Photo
2
Photo
3
Photo
4
Mounting screws
Installation procedure
Installation procedure
1 To install the device, use a flat blade screwdriver to
pry up the cover, with the same width as the plastic
opening (photo 2).
2
Unscrew the retaining screws and remove the
plastic cover containing the keys (photo 3)
.
3
Use the supplied support screws and plugs after
opening the required holes on the mounting surface
(photo 1). Install the base and align using the built-in
alignment vial. Tighten the retaining screws.
4
Press and remove the pre-etched cable entry
(photo 1). Perform the connections as shown in
the diagrams on page 8.
THE NEUTRAL IS NOT CONNECTED.
5
Reinstall with care the plastic with the keys and
fasten the mounting screws.
Maximum tightening
torque
0,5
N*m.
6
To activate the device remove the battery
separator (photo 4).
7
Reinstall the plastic cover and press gently until it
snaps into position. The unit is ready to operate.