4.
Complete all large and small
frame attachments. Screw each
completed section together with
8 - 2 1/2” screws.
5.
When completed, your floor footprint
should be 96” wide x 91” deep.
6.
Attach
Floor Runners
to completed floor frame.
There are 2 floor runners per 91” side and 5
completed runners in total. Use 6 - 2 1/2” screws
per Runner.
7.
Make sure Runners are flush
with floor framing and not
overhanging.
8.
Complete all Floor Runners, alternating long and short.
Front
91” deep
96” wide
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8