63.
Position 2
Door Trims
(2 - 1/2” x 2 1/2” x 87”) on each side of door opening. Right side will sit
flush with Door Jamb. Left side will sit flush on edge of Narrow wall. Do a dry run with the Horizontal
Gable Trim (
Step 82
) to determine vertical height of Trims. Attach with 8 - 1 1/2” finishing nails each.
Position
Triangular
Gable Trim
over exposed cavity of Gable Wall on Long Roof Side. Use
2 finishing nails to secure into rafter. Complete for both front and rear.
62.
Attach
Bottom Skirting
(8 @ 1/2” x 4 1/2” x 45 1/4”) around the base of the shed. Skirting will
hide floor framing. Gaps in corners will be covered by Wide Trim pieces later. Start with side pieces
first and attach with 4 - 1 1/2” finishing nails per piece.
2 pieces of Bottom Skirting per side
side skirting
Gap in corner
Front Skirting
Optional:
Caulking seams will help prevent
moisture from entering your shed. Caulking is
included to complete Polygal Windows only.
Addtional Caulking may be required.
Caulking
Determine vertical location of
trim by using horizontal Gable
Trim as a guide. See Step 82.
Note:
Triangular Gable
Trim is located inside
gable corner behind scrap
piece marked with “
X
”
Triangular
Gable Trim
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 26