20.
Position and secure Wall Panel studs
together as per
Step 18.
19.
Locate
3 Solid Side Walls
and
position on left side.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 13
21.
Front Side Wall Panel will sit flush with floor framing in corner when positioned correctly. Position
Right Side Double Window Wall on floor.
Front of Shed
Wall panel will
sit flush with
floor framing at
front of shed.
Side
22.
Position and secure Wall Panel studs together with 3 - 2 1/2” screws
.
Locate and position
remaining Double Window Walls on floor.