27.
Position
Front Top Plates
on top of wall framing so they are flush on the inside with 2x3 wall
frame. There are 2 Front Top Plates. Together, the plates should be centered evenly on the wall left to
right. Attach by screwing down into top wall framing with
4 - 2” screws
per Plate.
Angle cut
on 1 end.
Top Plates
Top Plates should
be flush with inside
of wall framing.
26.
When all walls are attached
together, check alignment with the
floor. Bottom wall framing should
sit flush with outside of floor joists.
When positioned correctly, fasten
bottom wall plates to floor using
4 - 2 1/2” screws
per wall panel.
Confirm 32” wide door opening
at bottom.
Bottom Wall
Framing
Important:
If walls are not lining
up and appear higher or lower than
each other, please check the level
of your floor. You may need to
make slight adjustments before
proceeding.
Optional:
Caulking seams will
help prevent moisture from
entering your shed. Caulking
is included to complete polygal
Windows only. Additional
Caulking may be required.
Caulking
Angle
screws into perimeter
Floor Joists.
32”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 16