Advice:
Prior to fastening walls and installing
rafters, take time to confirm your walls are
level, square and plumb.
Measure diagonal at top and bottom of walls
corner-to-corner. This should be approximately
189 3/8”. More importantly, if measurements
are not within 1/4”, your walls are not square.
Adjusting now will make it easier to the roof
section later
.
189 3/8”
189 3/8”
25.
Position and attach the Door Header to Door Jamb and Narrow Wall Panel top framing. Header
should sit flush with Door Jamb and Outside of Narrow Wall Siding. Attach with 4 - 2 1/2” screws.
Dado cut on edge to
top and outside.
24.
Locate Vertical Door Jamb and position flush against right wall panel stud. The Jamb is 3 1/4”
wide and will sit flush to outside of wall siding. When positioned correctly, secure Jamb using
4 - 2 1/2” screws.
Jamb sits flush
with Wall framing
Jamb sits flush
with tips of siding
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15