28.
Attach
Wall Trim/Supports
to wall with
3 - 2 1/2” screws
per side. Try to conceal screws if possible.
29.
At the doorway of your shed there will be
a small gap between the deck boards and floor
plywood. Fill this gap with the
Doorway Floor
Transition Strip
- angle edge cut and attach
with
4 - 1 1/2” Finishing Nails
.
30.
Locate both Rear Gable Wall
pieces. Rear Gables have shingles
that overhang the top and bottom of
the gable frame. Screw together with
3 - 2 1/2” screws
.
Hardware (Steps 28)
S1
- 2 1/2” Screws
x 6 total
Parts (Steps 29)
Doorway Floor Transition Strip
(1” x 1” x 32”)
x 1
Hardware (Steps 29)
N1 - 1 1/2” Finishing Nails
x 4 total
Parts (Steps 30)
Rear Gable Walls x2
Hardware (Steps 30)
S1 - 2 1/2” Screws
x 3 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 22