14.
Starting at Rear Corner, position a Wall Panel on top of plywood floor. Depending on your
preference, you may use a solid or window wall panel in this position. If using a solid wall, make
sure panel is facing up. Side Wall panels will sit flush to the end of the plywood floor with the Rear
Wall panels sandwiched between them. Position the side wall panel so the wall framing is flush
with the floor framing. Floor plywood will be flush or slightly recessed from the wall/floor framing.
Note:
Wall Siding will not be flush with floor frame, it will overhang by approximately 3/4”.
13.
Starting with All
Solid Wall Panels
, carefully lay panel face down.
Position and attach
Bottom
Wall Plates
to bottom of wall studs of each wall
panel with
3 - 2 1/2” screws
. Position so Wall Plates are flush with framing.
Bottom Wall Plate
Important:
Make sure
all walls are aligned in
their upright position. If
not, water may leak into
your playhouse. Unsure
if panel is facing up or
down? check siding on
window wall panel to
match alignment.
Outside 2x3 Plate of wall panel is flush with
outside of floor frame when properly
aligned. Floor plywood may be slightly
recessed.
Side W
all Panel
Parts (Steps 13)
Bottom Wall Plates
(1 5/8” x 2 1/2” x 45 1/2”)
x 4
Solid Wall Panels x 4
Hardware (Steps 13)
S1
- 2 1/2” Screws
x 12 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12