35.
Attach
4A - Bottom Skirting
around the base of the shed.
Skirting will hide floor framing. Start with side skirting pieces
first and attach with
4 - 1 1/2” Finishing Nails
per piece.
Parts (Steps 35 - 36)
4A - Side/Rear Bottom Skirting - Bevel
(3/4” x 4 1/2” x 45 1/4”)
x 5
Hardware (Steps 35 - 36)
N1 - 1 1/2” Finishing Nails
x 20 total
Rear Skirting
Gap
Side Skirting
36.
Gaps on outside will be covered by Corner Trim later. Complete side and rear skirting attachments.
37.
Attach
4B - Front Bottom Skirting
with
4 - 1 1/2” Finishing Nails
per piece as per
Steps 35 - 36.
Parts
4B - Front Bottom Skirting
(1/2” x 4” x 45 1/4”)
x 3
Hardware
N1 - 1 1/2” Finishing Nails
x 12 total
Skirting meets flush.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 23