Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 18
28.
With Rafter Section correctly aligned, secure rafters to walls using
2 - 90° Metal Brackets
per side. Attach each brackets with
4 - 1 1/4” Screws
.
Screw into Wall Extension Framing at the rear and Wall Panel top framing at
the front. Complete both sides.
Hardware
Y2 - 90° Metal Bracket
x 4 total
S2 - 1 1/4” Screws
x 16 total
90° Metal Brackets
29.
With outside rafters properly secured, attach remaining interior rafters using
1 - 2 1/2” Screw
per rafter end. Screw into rafters from inside of Header on an angle
at front of shed, and from inside of Extender Wall Framing at rear of shed.
Hardware
S1 - 2 1/2” Screws
x 12 total
30.
Carefully flip Roof Panels over so plywood sheathing is facing up.
Center
3F - Facia Nailing Strips
onto outside of each panel flush with
plywood. Attach with
4 - 1 1/4” Screws
evenly spaced. The Facia Nailing
Strip provides for a greater nailing surface later when you attach side facia.
Parts
3F - Facia Nailing Strips
(3/4” x 3/4” x 48”)
x 2
Front - Shingle overhang
Inside
-
Shingles
flush
Outside
Side
Facia Nailing
Strip.
Outside
-
Shingle
overhang
Hardware
S2 - 1 1/4” Screws
x 8 total