Page 21
37.
Screw first filler shingle down to rafters using
1 - 2 1/2” Screw
per panel (2 in
total). Screw on slight angle and make sure to screw into rafter. Screw slightly above
3rd row of shingles (exposure line). This way, the screw will get covered up when you
install your 2nd Filler Shingle and will prevent leaking. Do both roof seams the same.
Hardware
S1 - 2 1/2” Screws
x 4 total
3rd Shingle
Row
2nd Filler
Shingle.
4th Shingle
Row
38.
Slide 2nd
Filler Shingle
up and underneath fourth shingle row. Follow
Steps 36 - 37
to align and attach. Repeat for other roof seam.
Hardware
S1 - 2 1/2” Screws
x 4 total
39.
Slide 3rd and 4th
Filler Shingles
up and underneath appropriate shingle
rows and follow
Steps 36 - 38
to align and attach. On last filler, screws will get
covered by Roof Ridge Board (4 1/2” wide).
Hardware
S1 - 2 1/2” Screws
x 8 total
Attach above
the exposure
line.
Exposure
Line.