Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15
39.
Secure Roof Panels to Center Rafter
using 2 - 2 1/2” screw. Make sure to screw
into Center Rafter
40.
Slide first 18” long
Filler Shingle
where roof
panels meet until flush at bottom.
41.
Screw first Filler Shingle down to
Center Rafters as per
Step 40.
Screw first filler
shingle down to
rafters using
1 - 2 1/2” screw per
panel (2 in total).
Make sure to screw
into both rafter.
attach above the
exposure line.
exposure line
42.
Locate all
Roof Ridge Caps
. Note, Ridge Caps are offset to one another. Place 1st Ridge Cap on roof
seam slightly overhanging roof end and attach with 2 - 1 1/4” Shingle Nails. Position 2nd Ridge Cap offset to
1st. Align on top and nail down with 2 Shingle Nails approximately 9” from Ridge Cap butt.
7
1/2”
Offset