35.
With Rafter Section correctly aligned, secure rafters to walls using
90° Metal Brackets
. Start with
outside rafters and secure 2 Brackets with
4 - 1 1/4” Screws
per bracket. Screw into Wall Extension
Framing at the front, and Wall Panel top framing at the rear. Complete both sides.
90° Metal Brackets
36.
With outside rafters properly secured, completely secure remaining interior rafters using
8 - 2 1/2” Screws
. Screw into rafters from inside of Extension Wall framing at front of shed and inside
Rear Wall framing at rear of shed, behind Horizontal Wall Cleats.
Front
Front - Shingle overhang
Inside - Shingles flush
Outside Side
37.
Carefully flip Roof Panels over so plywood sheathing is facing up.
Center
Rafter/Facia Nailing Strips
(2 @ 3/4” x 3/4” x 51) onto outside of
each panel flush with plywood. Attach with
4 - 1 1/4” Screws
evenly spaced.
The Rafter/Facia Nailing Strip provides for a greater nailing surface later when
you attach side facia.
Rafter/Facia Nailing Strip.
Outside - Shingle overhang
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20