3.
Position
1C
- Floor Runners - Short
on each
side of the completed floor frame. Runners should
be flush with corners but not overhanging. Attach
with
4 - 2 1/2”
Screws
per Runner.
Parts
1C - Floor Runners - Short
(1 1/2” x 3 1/2” x 45 1/2”)
x 2
Hardware
S1
- 2 1/2” Screws
x 8 total
4.
Align
1CC - Floor Runners - Long
evenly spaced as shown above and
flush with the back of the Floor Frame. On the front, Runners will extend 2”
past the Floor Frame to provide support for the Sliding Door Track later in
the Assembly. Attach with
4 - 2 1/2”
Screws
per Runner.
With Floor Runners attached, carefully flip the floor over and place on your
foundation.
Caution -
Be careful when laying floor down not to bend or twist
floor.
Note:
Having a level foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can be concrete pads or patio
stones positioned underneath the floor runners.
5.
Position
1D - Plywood Floor
on top of completed floor frames.
Plywood will sit slightly inset from outside of floor frame.
Parts
1D -
Plywood Floor
(5/8” x 45 3/8” x 70 5/8”)
x 2
Note:
Plywood is cut slightly
smaller than floor framing.
Keep plywood seams tight.
Parts
1CC - Floor Runners - Long
(1 1/2” x 3 1/2” x 47 1/2”)
x 5
Hardware
S1
- 2 1/2” Screws
x 20 total
Long Floor Runners overhanging Floor Frame on front.
Floor Runners flush with Floor Frame on back.
Concrete Slab
Foundation
Front
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9