54.
Install both
4KA - Track Overlay - Top
pieces above the aluminum tracks. Position
pieces horizontally as shown above. Attach
with
3 - 4” Screws
per piece through the
pre-drilled holes.
Parts (Steps 54 - 55)
4KA - Track Overlay - Top
(1 1/2” x 3 1/2” x 66 1/2”)
x 2
4KB - Track Overlay - Front
(3/4” x 5 1/2” x 67”)
x 2
4KC - Track Overlay - Ends
(1/2” x 3 1/2” x 5 1/2”)
x 2
Hardware (Steps 54 - 55)
S5 - 4” Screws
x 6 total
N1 - 1 1/2” Finishing Nails
x 24 total
55.
Position both of
4KB - Track Overlay - Front
onto the edge of the Overlay Top so they meet at the
center. Ends of the Overlay Front will protrude 1/2” past the ends of the Overlay Top. Attach with
8 - 1 1/2” Finishing Nails
per piece.
Next, attach
4KC - Track Overlay - Ends
as shown above with
4 - 1 1/2” Finishing Nails
per piece.
Centered above
Aluminum Tracks.
Bottom of overlay
should touch tip
of bolts.
Flush
with top.
Track Overlay
End pieces.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 35