background image

S1 - 2 1/2” Screws

S4 - 3” Screws

x 245

x 25

x 195

x 330

S2 - 1 1/4” Screws

N1 - 1 1/2” Finishing Nails

BR1 - Square Drive Bit

x 2

Y3 - Black Handle

x 2

Y11 - Black Hasp

x 1

x 18

SB1 - 3/4” Screws

Black Headed

  
Ladder

Screw Gun/Drill

Tape Measure

Hammer

Level

Pliers

Tools Required 

(Not Provided)

1/8” Drill Bit

Wood Clamp

Utility Knife

12X4 GardenSaver Shed with Sliding Double Doors HARDWARE PACKAGE

Y35 - Roller 
Assembly

x 4

Safety Glasses

Work Gloves

Safety Equipment Required  

(Not Provided)

ST1 - 1 1/2” Torx Screws

12

S5 - 4” Screws

Y2 - 90° Metal 
Bracket (Roof)

x 8

x 8

BT2 - Torx Drive Bit

x 1

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 6

Содержание GS124-SLIDER-CEDAR-AK

Страница 1: ...s prior to assembly Safety Points and Other Considerations Our products are built for use based on proper installation on level ground and normal residential use Please follow the instruction manual w...

Страница 2: ...on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual I...

Страница 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 2 Cubic Yards of gravel required...

Страница 4: ...2 45 Angle Wall Extenders Left Right 2H 3 9 x 45 Wall Extenders 2I 3 1 1 2 x 2 1 2 x 42 3 8 Wall Extender Cleats Wall Cleats 2J 1 x 3 x 84 Horizontal Wall Cleat Long 2K 2 x 3 x 26 Horizontal Wall Cle...

Страница 5: ...5 x 78 Rear Corner Trims 4O 2 x 2 x 80 Side Rear Corner Trims 4P 2 x 2 x 78 Rear Middle Trims 4Q 2 x 2 x 7 Front Middle Trims Facia 4R 2 x 5 x 54 1 8 Side Facia Angle Cut Ends 4S 4 x 5 x 50 Front and...

Страница 6: ...Hammer Level Pliers Tools Required Not Provided 1 8 Drill Bit Wood Clamp Utility Knife 12X4 GardenSaver Shed with Sliding Double Doors HARDWARE PACKAGE Y35 Roller Assembly x 4 Safety Glasses Work Glov...

Страница 7: ...off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour Painting...

Страница 8: ...Frame and two 1B Floor Joists as illustrated above Position the center of each Joist 15 from the outer edge of Floor Frame When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per end You...

Страница 9: ...aution Be careful when laying floor down not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads...

Страница 10: ...ry to complete the Wall Section Identify all parts prior to starting Angled Wall Extenders 2pcs Part 2G Side Rear Wall Panels 5pcs Part 2AA Bottom Wall Plates 5pcs Part 2AB Front Wall Panels 2pcs Part...

Страница 11: ...f panel is facing up or down Recently attached Bottom Plate is on bottom of panel Outside 2x3 framing of wall panel should be positioned flush with the outside of floor framing when properly aligned 9...

Страница 12: ...joists Wall siding should overhang floor by approximately 3 4 When positioned correctly attach both side wall panel studs together as per Step 10 10 Position rear solid wall into place on plywood floo...

Страница 13: ...Place Front Walls so wall framing is flush with floor frame and siding overhangs Attach with 3 2 1 2 Screws per panel as per Steps 10 12 12 Complete remaining side wall attachment as per Steps 10 11...

Страница 14: ...top Align flush outside with wall siding 15 Attach 2C Door Header Short to other side Position and attach 2D Door Header Long between short door headers The Long Door Header has an aluminum strip atta...

Страница 15: ...xtender will overhang and cover siding of side wall Parts 2G Angle Wall Extenders L R 2G 45 1 2 wide x 2 2F Top Triangular Siding Piece 2F Left Right x 2 Hardware N1 1 1 2 Finishing Nails x 6 total 17...

Страница 16: ...nder Walls 2H 45 1 2 wide x 3 Hardware S1 2 1 2 Screws x 12 total 19 Complete opposite Angled Wall Extender positioning and attachment as per Step 18 Cleat protects overhanging siding on upper walls f...

Страница 17: ...h 3 1 1 4 Screws per short cleat and 6 1 1 4 Screws on the long cleat Parts 2J Horizontal Wall Cleat Long 3 4 x 3 1 2 x 84 x 1 2K Horizontal Wall Cleats Short 3 4 x 3 1 2 x 26 1 4 x 2 Hardware S2 1 1...

Страница 18: ...f measurements are not within 1 4 your walls are not square 23 Attach 2E Interior Door Header as shown above Align with top framing of front walls Attach with 4 2 1 2 Screws Hardware S1 2 1 2 Screws x...

Страница 19: ...R 2pcs Part 3B Front Soffit Center 1pcs Part 3C 24 To complete Wall Section attach bottom 2x3 wall plates to plywood floor with 2 2 1 2 Screws per wall section Prior to securing make sure wall panels...

Страница 20: ...r Front 141 1 2 Parts 3A Rafters 1 1 2 x 2 1 2 x 54 x 9 3B Front Soffits Sides 1 2 x 3 1 2 x 48 x 2 3C Front Soffit Center 1 2 x 3 1 2 x 45 1 2 x 1 3D Rear Soffits Sides 1 2 x 3 1 2 x 48 x 2 3E Rear S...

Страница 21: ...y 40 1 2 40 1 2 Check inside to inside measurements of wall studs This should be consistent along the length of the shed approximately 40 1 2 26 Carefully flip completed Rafter Section over so Front S...

Страница 22: ...and from inside of Rear Wall top framing at rear of shed behind Horizontal Wall Cleats Hardware S1 2 1 2 Screws x 14 total 31 Carefully flip Roof Panels over so plywood sheathing is facing up Center...

Страница 23: ...od sits evenly on Center Rafters Next position 3H Center Roof Panel onto center rafters Shingles overhang plywood on outside Edge of plywood 1 8 recessed from rafter end Plywood flush with shingles on...

Страница 24: ...5 Position other side roof panel onto rafters as per Steps 32 34 36 With Roof Panels aligned screw panels down to center rafters with 2 2 1 2 Screws in Bottom Row of Shingles Only 1 screw per panel Ha...

Страница 25: ...ps 38 40 S1 2 1 2 Screws x 16 total 3rd Shingle Row 2nd Filler Shingle 4th Shingle Row 39 Slide 2nd Filler Shingle up and underneath fourth shingle row Follow Steps 37 38 to align and attach Repeat fo...

Страница 26: ...Top Siding Pc for Angle Wall was not installed in Step 16 it can be done now Attach with 3 1 1 2 Finishing Nails per piece 42 To further secure roof panels from the inside drill pilot holes on an ang...

Страница 27: ...4B Front Facia L R Part 4S Front Facia Part 4T Interior Door Flange Part 4J Front Corner Filler Trim Part 4C Rear Corner Filler Trim Part 4D Lower Door Track Cover Parts 4HA Lower Door Track Part 4G...

Страница 28: ...Hardware N1 1 1 2 Finishing Nails x 12 total Skirting meets flush 43 Attach 4A Side Rear Bottom Skirting around the base of the shed Skirting will hide floor framing Start with side skirting pieces fi...

Страница 29: ...red 46 Position and attach 4C Front Corner Filler Trim with 4 1 1 2 Finishing Nails per piece Filler trims won t be visible because they serve as nailing strips for the Corner Trims which will be atta...

Страница 30: ...Track Position second Track the same and attach with 3 1 1 2 Torx Screws per bracket Complete remaining Torx Screws on brackets of first Track Hardware ST1 1 1 2 Torx Screws x 12 total 33 1 4 Attach...

Страница 31: ...s meet in the middle Left Side Door Parts 4F Sliding Doors 36 x 73 x 2 Right Side Door Twist Roller Cart onto bolt After doors are hung you may need to adjust this until doors hang straight up and dow...

Страница 32: ...ld be flush with each other Secure Door Tracks to shed with 6 3 screws per piece Secure Door Stops with 2 3 screws per piece Parts 4G Lower Door Track 1 1 2 x 1 1 2 x 61 1 8 x 2 4IA Door Track Stops 1...

Страница 33: ...so doors can not slide out of the track Secure each piece of Track Cover with 4 2 1 2 screws Parts 4HA Lower Door Track Cover 3 4 x 3 x 44 1 4 x 3 Hardware S1 2 1 2 Screws x 12 total Door Stop and Tra...

Страница 34: ...door frame and attach with 5 1 1 4 Screws Parts 4J Interior Door Flange 3 4 x 3 1 2 x 71 1 2 x 1 Hardware S2 1 1 4 Screws x 5 total Left Side Door Left Side Door Right Side Door Door Flange attaches...

Страница 35: ...s x 6 total N1 1 1 2 Finishing Nails x 24 total 55 Position both of 4KB Track Overlay Front onto the edge of the Overlay Top so they meet at the center Ends of the Overlay Front will protrude 1 2 past...

Страница 36: ...88 3 4 x 2 4M Side Front Corner Trims 1 2 x 2 1 2 x 88 3 4 x 2 Hardware N1 1 1 2 Finishing Nails x 32 total 5 1 2 tight underneath soffit 56 Position 4KD Track Overlay Sill pieces evenly on top of Tr...

Страница 37: ...1 2 x 78 1 2 x 2 Hardware N1 1 1 2 Finishing Nails x 16 total 58 To complete trimming out rear corners locate 4N 4O Rear Corner Trims Align and attach as per Step 57 Parts 4N Rear Corner Trims 1 2 x 5...

Страница 38: ...e Cut Ends 1 2 x 5 1 2 x 54 1 8 x 2 4S Front Rear Facia L R 1 2 x 5 1 2 x 50 1 2 x 4 4T Front Rear Facia Center 1 2 x 5 1 2 x 45 1 2 x 2 Hardware Steps 61 64 N1 1 1 2 Finishing Nails x 46 total 60 Att...

Страница 39: ...ps 61 63 Small gaps may occur between the Center and Left Right Facia these will be covered by Facia Detail Plates in Step 65 Rear Facia will cap the side Facia Attach Rear Facia to rafter ends with 2...

Страница 40: ...are secured to 2x4 backing Parts 4U Trim Detail Plates 5 1 2 high x 5 Hardware N1 1 1 2 Finishing Nails x 19 total 66 Position 4V Roof Ridge Board at the rear of roof to cap off shingles and facia Rid...

Страница 41: ...rge amount Trim dado sits in flange 68 Position 4X Window Trim around window doing a dry run first and attach with 4 1 1 2 Finishing Nails per piece Window trim has a small dado on reverse face Outsid...

Страница 42: ...mer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com The mat...

Отзывы: