28.
When all walls are attached
together, check alignment with the floor.
Bottom wall framing should sit flush with
outside of floor joists and plywood floor.
Confirm 64” wide door opening at
bottom.
When positioned correctly, fasten bottom
wall plates to floor using 4 - 2 1/2” screws
per wall panel.
Bottom Wall
Framing
29.
Position
Front and Rear Top
Plates
on top of wall studs so it is flush
on the inside with 2x3 wall framing.
There are 3 pieces of Front Top Plates
(2 angle cut /1 end pieces and 1 middle
straight cut /both ends). Together, the
plates should be centered evenly on the
wall left to right.
Attach by screwing down into top wall
framing with 3 -2” screws per piece.
Angle cut on ends
Top Plates should be flush
with inside of wall framing.
Confirm 64” Wide Door Opening at Bottom
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11