37.
Roof Gussets
are positioned on middle
Rafters
. Prior to attaching
,
make
sure walls are properly aligned. Have two helpers push walls at the top from the
outside of shed until inside to inside measurement between front and rear plates
is 91”. Use a level to square
Gusset
. Attach Gusset with 4 - 2” screws.
Parts
Roof Gussets
(3/4” x 3 1/2” x 72”)
x 3
Hardware
S3
- 2” Screws
x 12 total
91” across
38.
Attach all
Single
and
Double Rafter
Brackets
where rafters meet
Top Wall
Plates
inside of shed. Attach with
2 - 1 1/4” screws
and
2 - 2” screws
per
Single Bracket
and
6 - 2” screws
per
Double Bracket.
2” Screws
2” Screw
2” Screw
1 1/4” Screw
2” Screws
1 1/4” Screw
Hardware (Step 38)
S2 - 1 1/4” Screws
x 8
total
S3 - 2” Screws
x 20
total
Y30 - Single Rafter Brackets
x 4
total
Y31 - Double Rafter Brackets
x 2
total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 24
39.
Locate one sheet of
Roof Plywood Large
. Position on right side of shed.
Recess plywood back approximately 1/8” from end of
Rafter
. Plywood will over-
hang outside Rafter by 3 3/4” and on opposite side, plywood will be centered on
5th rafter, being supported by
Rafter Nailing Cleat
.
Parts
Roof Plywood Large
(5/8” x 48” x 72”)
x 1
Hardware
S2
- 1 1/4” Screws
x 12 total
Overhang outside rafter by 3 3/4”.
Centered on 5th Rafter and
recessed 1/8” from Rafter end.