background image

P 1

03WES1208-V2

12x8 Wessex Summerhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instruction pages for youR specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Summary of Contents for 03WES1208-V2

Page 1: ...sed treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is t...

Page 2: ...eranda Rail 03WESVRDRL V1 10 Window QTY 2 01OW V1 11 Glazing QTY 4 PI 05 0038 12 29 25 27 26 28 34 30 31 32 Final QTY 2 33 13 14 15 16 17 18 19 Veranda Support 27x44x1685mm QTY 2 F2744 1685mm Fascia 1...

Page 3: ...h door to the door gable again using 30mm black screws 44x30mm Black Screws Pre drill hole 30mm screw 20 19 19 Step 3 Fix the door beading strips to the door gable using 4x30mm screws for each strip M...

Page 4: ...e the building to the floor until the roof is fixed 6x50mm Screws a b Pre drill hole 50mm screw Step 8 Following the same method outlined in step 6 attach the door gable the remaining window side onto...

Page 5: ...ing with 10x30mm screws Repeat this process with the next two roof panels 20x30mm Screws Pre drill hole 30mm screw Step 11 Locate the roof panels on to the gables making sure the roofs sit inbetween t...

Page 6: ...rews per side 14x50mm Screws Pre drill hole 50mm screw Step 15 Fix the cover trims to each corner of the building and across the panel joints on each side securing the trims in place with 18x30mm scre...

Page 7: ...m screw Pre drill hole Pre drill hole Pre drill hole Step 18 Place the cover strip 13mm above the gap in the window panel and fix into place using 3x30mm screws 6x30mm Screws If you would like the wid...

Page 8: ...0mm screws Ensure the key hole lines up with the lock and the mechanism can be opened and closed without restriction 4x30mm Screws Pre drill hole 30mm screw Step 22 Secure the handle to the master doo...

Page 9: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Reviews: