2.
When correctly positioned, attach each Joist with
4 - 2 1/2”
screws (2 per end).
Complete all Floor Frame and Joist connections.
You can find the Square Drive Bit for the screws
in with the Hardware Kit Bag.
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
4.
Attach each completed section together with
16 - 2 1/2” screws
as illus-
trated above.
Hardware (Step 4)
S1
- 2 1/2” Screws
x 32
total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
3.
Lay out
one of each Floor Frames
as shown above. Attach th 66 1/2” frame to the 75” with
6 - 2 1/2” screws
(18 total).Complete 3 sets.
136 1/2”
141 1/2
Front Door
on this side