Parts (Step 59, 61)
Side Facia
(3/4” x 5 1/2” x 71 1/4”)
x 4
Hardware (Step 59, 61)
N1 - 1 1/2” Finishing Nails
x 32 total
59.
Attach
Side Facia
to roof
Rafter
ends. There are 2
Side Facia
pieces per
side. Secure with
8 - 1 1/2” Finishing
Nails
per piece. S
ide Facia
will cap
Front
and Rear Facia
.
60.
Attach remaining
Front & Rear Facia
pieces to
Facia Cleats
under Roof
Battens
with
10 - 1 1/2” Finishing Nails
. Once again, line up
Facia
so it is aligned with
Rafter
ends. Do a dry run
with
Front, Rear and Side Facia
to confirm positioning prior to attaching.
61.
Attach remaining
Side Facia
to roof
Rafter
ends as per
Step 59
.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 35