Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 13
26.
Locate all Post Skirting pieces. Position 2 post skirtings around the base of post as shown above.
Use
1 Post Skirting with Cleat - 1 1/2” x 9” x 10” (Part J)
and a
Post Skirting with Dado Cut -
1 1/2” x 9” x 10” (Part K)
initially. Cleat piece should be aligned opposite post mount hardware and
dado piece aligned with post mount bolts (hardware).
Post Skirtings with dado cuts - (K)
Post Skirtings with Cleat (J)
27.
With your helpers assistance, screw Part J & K pieces together with 2 - 2” screws at pre-drilled
locations. Make sure pieces are aligned on edges and top and bottom. Cleated skirting piece are
pre-drilled. Complete remaining skirting pieces around the post. Position skirting unit evenly around
post. Secure to post by screwing 1 - 2 1/2” screw into the center of each cleated skirting piece (J).
Post
Skirting
Caps (L)
Post mount bolts
28.
Position
Post Skirting Caps - 1 1/2” x 2 1/2” x 10 5/8” (Part L)
on top of skirting unit and
against post. Do a dry run first to confirm fit. There will be a small gap between post and inside of cap.
Attach caps down into skirting tops with
3 - 2 1/2” Stainless Steel Finishing Nails
per piece.
Complete remaining post skirtings.
dado cut
Skirting with
Cleat (J)
Dado cut skirting(K)
same height
2” screw
2” Stainless Nail
2 1/2” screw
small gap