background image

18

240011511 REV. C [05/31/2017]

COOLING OR HEAT PUMP HEATING

SW2  COOL                                                          

DIP SWITCH POSITION 

AC SIZE 

[TONS]

CFM WITH SW3-ADJ            

DIP SWITCH POSITION A

CFM WITH SW3-ADJ          

DIP SWITCH POSITION B

CFM  WITH  SW3-ADJ            

DIP SWITCH POSITION C

A (1=OFF, 2=OFF)

3.5

1400

1600

1190

B (1=ON, 2=OFF)

3.0

1200

1380

1020

C (1=OFF, 2=ON)

2.5

1000

1150

850

D (1=ON, 2=ON)

2.0

800

920

680

The CFM's shown are reduced by 20% if 24 VAC input is to Y1 (slow speed of 2 speed compressor) instead of Y/Y2

APPENDIX A - CHECK OUT AND ADJUSTMENTS

Table A-11 Direct Drive Blower Characteristics - 1/2 HP ECM Variable Speed Constant CFM Motor - continued

DELAY PROFILE FOR OIL HEATING

SW4  DELAY                                                        

DIP SWITCH POSITION

INPUT 

[USGPH]

PRE  RUN  ON  DELAY                  

TIME - CFM LEVEL

SHORT  RUN  ON  DELAY              

TIME - CFM LEVEL

OFF  DELAY                                

TIME - CFM LEVEL

A (1=OFF, 2=OFF)

0.65

60 SECONDS - 0%

60 SECONDS - 63%

2 MINUTES - 75%

B (1=ON, 2=OFF)

0.85

30 SECONDS - 0%

60 SECONDS - 63%

2 MINUTES - 88%

C (1=OFF, 2=ON)

0.75

60 SECONDS - 0%

60 SECONDS - 88%

2 MINUTES - 82%

D (1=ON, 2=ON)

0.55

60 SECONDS - 0%

60 SECONDS - 50 %

2 MINUTES - 69%

DELAY PROFILE FOR COOLING OR HEAT PUMP HEATING

NO ADJUSTMENT 

REQUIRED

AC SIZE 

[TONS]

PRE  RUN  ON  DELAY                    

TIME - CFM LEVEL

SHORT  RUN  ON  DELAY              

TIME - CFM LEVEL   

OFF  DELAY                                                     

TIME - CFM LEVEL

N/A

ALL

7.5 MINUTES - 82%

NONE

NONE

Содержание LRF65

Страница 1: ...RFV Lowboy Rear Flue Model with ECM Blower Oil Fired Warm Air Furnaces P N 240011511 Rev C 05 31 2017 ECR International 2210 Dwyer Avenue Utica NY 13501 web site www ecrinternational com INSTALLATION...

Страница 2: ...Weight Width A Length B Height C Supply D x E Return F x G Diameter Height H LRF LRFV 22 53 33 8 20 x 18 20 x 18 8 5 29 20 x 20 x 1 240 LB 55 8 cm 135 9 cm 85 4 cm 52 1 cm x 45 7cm 52 1 cm x 47 3cm 1...

Страница 3: ...ifier 7 16 Piping Installation 7 17 Oil Filter 7 18 Oil Burner Nozzles 8 19 Oil Burner Adjustment 8 20 Burner Electrodes 8 21 Burner Primary Safety Control 8 22a Circulating Air Blower LRF LRFV 8 22b...

Страница 4: ...stitute of Canada HRAI or by other means prescribed or approved by the local authority having jurisdiction United States Manual J titled Load Calculation published by the Air Conditioning Contractors...

Страница 5: ...furnace in parallel with or upstream from evaporator coil to avoid condensation in heat exchanger When installed in parallel prevent chilled air from entering furnace by use of dampers or other air c...

Страница 6: ...oint for most of furnace electrical components United Technologies 1158 120 has an adjustable fan on time set by selecting dipswitch combination displayed in Chart 1 Fan on delay can be set at 30 60 9...

Страница 7: ...rom electronic fan timer board where provisions have been made for connections but should have their own controls Do not use direct drive motor connections as a power source there is risk of damaging...

Страница 8: ...itive If problems persist call your service contractor WARNING Fire burn asphyxiation hazard Do not start the burner unless blower access door is secured in place Failure to follow these instructions...

Страница 9: ...gs Blower speed and on off time delays are handled by ECM motor programming and are set via dipswitches per Table A 10 Heating airflow rate is SW1 and on off delay is SW4 both are set according to fir...

Страница 10: ...all for heat Burner should start It may be necessary to press RESET button on primary combustion control relay 2 There is a fan on time delay before circulating fan is energized United Technologies 11...

Страница 11: ...GPH Head Air Setting LRF65 LRFV65 66 000 AFG70MPSS 0 50 45 W 140 0 55 L2 4 LRF80 LRFV80 78 000 AFG70MPSS 0 50 45 W 175 0 65 L2 5 LRF90 LRFV90 89 000 AFG70MPSS 0 60 60 W 175 0 75 L2 7 LRF100 LRFV100 10...

Страница 12: ...3 APPENDIX A CHECK OUT AND ADJUSTMENTS Table A 4 Riello 40BF Burner Set Up Riello 40BF3 40BF5 Series Oil Burners For use with direct vent units using outdoor combustion air only Furnace Model Output...

Страница 13: ...ce above horizontal center line 13 64 inch Distance ahead of nozzle 5 64 to 7 64 inch Carlin Burners Electrode gap 1 8 inch to 5 32 inch Distance above horizontal center line 5 16 inch Distance ahead...

Страница 14: ...blower motor Isolate AC line voltage pins on 5 pin power connector with electrical tape to prevent electric shock hazard C Restore electrical power to furnace D Set thermostat above room temperature E...

Страница 15: ...15 240011511 REV C 05 31 2017 APPENDIX A CHECK OUT AND ADJUSTMENTS FIGURE 3 UNITED TECHNOLOGIES 1168 1 ECM TAP BOARD LRFV FIGURE 2 UNITED TECHNOLOGIES 1158 120 FAN TIMER BOARD LRF...

Страница 16: ...A CHECK OUT AND ADJUSTMENTS TIP Formulas will assist with design of duct work and determination of air flow delivery CFM Bonnet Output 1 085 x System Temperature Rise T System Temperature Rise T Bonn...

Страница 17: ...ON is approximately equal to 400 CFM SW3 ADJUST Increase OR decrease CFM respectively APPENDIX A CHECK OUT AND ADJUSTMENTS Table A 11 Direct Drive Blower Characteristics 1 2 HP ECM Variable Speed Cons...

Страница 18: ...11 Direct Drive Blower Characteristics 1 2 HP ECM Variable Speed Constant CFM Motor continued DELAY PROFILE FOR OIL HEATING SW4 DELAY DIP SWITCH POSITION INPUT USGPH PRE RUN ON DELAY TIME CFM LEVEL SH...

Страница 19: ...19 240011511 REV C 05 31 2017 APPENDIX B WIRING DIAGRAMS Chimney Vent Furnace Wiring Diagram LRF LRFV...

Страница 20: ...20 240011511 REV C 05 31 2017 APPENDIX B WIRING DIAGRAMS Direct Vent Furnace Wiring Diagram LRF LRFV...

Страница 21: ...at cool speed Thermostat ends call for cool G and Y terminals are de energized Cooling contactor is de energized immediately Circulator fan turns off immediately FAN Thermostat begins call for fan G...

Страница 22: ...stage of two stage cooling Y1 while Y Y2 is not calling The 24 VAC input signal is passed to pin 6 of P1 Blower runs at 80 of cooling speed profile FAN Thermostat calls for fan G The 24 VAC input sig...

Страница 23: ...ay burn out heat anticipator of standard 24 vac thermostat or cause harm to components within micro electronic thermostat Before checking oil primary control perform these preliminary checks repair or...

Страница 24: ...epair light leak if necessary Open safety switch Check for open limit or auxiliary limit Check internal wiring connections loose connectors etc Furnace will not start without first pushing oil primary...

Страница 25: ...supplier Frozen oil line Gently warm oil line Insulate oil line Outdoor piping size may require increased diameter Oil burner sputtering at nozzle Electrodes out of adjustment or defective Check elec...

Страница 26: ...e rise is too high speed up blower fan Defective high limit control Test high limit function of all limit switches Use duct thermometer to verify accuracy of limit control Check for obstructions to ai...

Страница 27: ...05 31 2017 Model No Serial No Date Installed Contractor Contact Address Postal Code Telephone No After Hours No Fuel Supplier Fuel Oil Supplier Contact Telephone No After Hours No APPENDIX D HOMEOWNER...

Страница 28: ...pe Assembly 3002317 23 Flue Pipe Insulator Pipe 29713 24 Flue Pipe Flange 109009797 25 Flue Pipe Gasket 3 per unit 240011382 26 Observation Port Sight Glass 240008235 27 Sight Glass Washer 109009449 2...

Страница 29: ...BOF 130 F 30388 40 Oil Burner Assembly Beckett AFG70MPSS 0 50 45 W 550003220 Oil Burner Assembly Riello 40F3 0 55 80 B 550003221 Oil Burner Assembly Carlin EZ LF 0 50 70 B 550003222 41 Filter Side Rai...

Страница 30: ...sure Switch for use with Beckett Burners 0 65 WC Blocked Vent Safety Switch 240011862 5 x 4 Appliance Adapter Connects Furnace to Vent Pipe 240011898 Combustion Air Intake Collar 4 for Beckett Burner...

Страница 31: ...0011511 REV C 05 31 2017 PARTS LISTING Model LRF LRFV Diagram 1 2 3 4 8 7 9 11 14 15 16 16 27 28 30 31 32 33 34 36 37 42 40 25 21 15 18 13 41 25 24 23 22 25 29 35 20 10 19 19 17 38 8 5 41 6 26 16 31 3...

Страница 32: ...ECR International 2210 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: