______________________________________________________________________________________
Pro900DP Set-Up and Print Overview
4
1.2
Initial Gate Adjustment
Note: For this step, the feeder should be in the Powered-Off state.
The goal of this step is to get one piece of media to pass under the
opening in the feeder (gate) with light drag/friction on the media.
- Select one piece of media and slip under the gate assembly.
- Locate the knob on the top of the feeder labeled with ‘Lower’ and a
rotational arrow. This is the height adjustment knob for the gate.
- Slide the piece of media back and forth under the gate assembly while
turning the gate height adjustment knob until there is light drag from
the belt/gate on the media.
- The opening of the feeder is now ready for the initial feed test.
Next Step: Loading the ‘pre-shingled’ stack into the feeder guides
Содержание proColor pro900DP
Страница 1: ......
Страница 2: ......
Страница 18: ...OKI Oki Electric Industry Company Ltd 2010 Oki Data Americas Inc 5940xxxx...