● Use carbon or stainless steel for FGR piping. Pipe wall must not be too thick.
● Route the duct with a minimum number of elbows, still allowing a normal expansion
and contraction of the duct. Place pipe supports to avoid excessive load to pipe
connection.
● Leave space for the pipe joint movement during the expansion and contraction of
the duct.
● Provide condensation drains, if needed. Check the drain volume needs.
To mount FGR duct system:
1. Place the inlet to the stack as close as possible to the boiler or economizer. Set
cutting in 45° angle.
2. Set control damper close to the burner.
3. Finish the FGR duct pipe joint carefully with seal welding, flange or screw
connection. Make sure that the joint is tight and no air can enter the duct.
4. Place condensate drains both at the beginning and the end of pipe line.
5. Install one drain upstream from the FGR control valve, and another in the FGR
shut-off valve, if used.
6. In case of heavy condensation, add a condensate drain to the bottom of the
housing.
7. Anchor supports to provide stability in the duct.
Excessive load on the pipeline may cause damage to the burner or its
components. The construction must be self-supporting.
Installing temperature sensor
D055288 ver. 1
1
Temperature sensor
4
Butterfly valve
2
FGR pipe (*)
5
Burner
3
Sleeve (*)
A
Min. 7.87 in
* not included in delivery
M4263 2206EN
29 (102)
Содержание GP-1000 M
Страница 2: ......
Страница 16: ...Block diagram of contact links Block diagram ver 7 14 102 M4263 2206EN...
Страница 85: ...5 5 Time sequence diagram gas use 7550f57e 0515 Gp1 ver 6 M4263 2206EN 83 102...
Страница 105: ......