5
B
B
C
C
H
H
6
6
1
1
0
0
M
M
o
o
w
w
e
e
r
r
C
C
a
a
r
r
r
r
i
i
e
e
r
r
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
I
I
n
n
s
s
t
t
r
r
u
u
c
c
t
t
i
i
o
o
n
n
s
s
CAUTION: Wear proper protective equipment such as Safety
Glasses and protective shoes when assembling.
Lay out all parts so location and verification will be easier. Make sure all parts were received
before proceeding with the assembly.
Install the two Tire and Wheel Assemblies onto the Hub Assemblies and properly tighten Lug
Bolts or Lug Nuts.
Attach the Tongue Jack to the Main Frame Weldment and secure in place with the Locking Pin.
Attach the Driveshaft Support Weldment to the Main Frame using six 1/2” x 1 ½”” Capscrews,
Lockwashers and Hex Nuts. If the Spline Shaft and Flange Bearings are not installed in the
Driveshaft Support, do so at this time using four ½” x 4 1/2” Hex Capscrews, Lockwashers and
Hex Nuts. Mount the Flange Bearings with the Grease Zerks toward the bottom. Install the
Spline Shaft with 5” of shaft between the bearing flange and the end of the shaft protruding on
the backside. After inserting the Spline Shaft into the Flange Bearings, be sure to lock the
eccentric lock collars on both Flange Bearings. Standing at the rear of the Mower Carrier and
facing forward, lock both collars in a clockwise direction and tighten the setcrews.
Install the two Driveline Shields using eight 3/8” x 1” Hex Capscrews, Lockwashers and Hex
Nuts.
Содержание BCH610
Страница 2: ......
Страница 13: ...11 Notes ...
Страница 14: ...12 ...
Страница 16: ...14 Notes ...
Страница 18: ......
Страница 19: ......