OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
4
Installation
1. Assemble the Cup Assemblies as illustrated below and in the drawing
on page 24. The brass weight is an optional piece for simulating an
overburden pressure applied to the swelling core sample.
2. Assemble the Main Assemblies as depicted below and in the drawing on
page 26. Adjust the height of the head assembly such that there is a
small gap (approximately 5 mm) between the bottom of the nut on the
spindle and the body of the LVDT without a wafer inserted into the cup
assembly.
Transfer Stand
(#150-80-032)
Cap for Wafer Tube
(#150-80-036)
Bottom (Main) Plate
(#150-80-034)
Teflon Washer
(#150-80-031)
Brass Weight (Optional)
(#150-80-009)
Wafer Tube
(#150-80-033)
Magnetic Stir Bar
(Comes w/Hot Plate)
(#153-53-1)
Cup
(#150-80-035)
Micrometer (#150-80-067)
LVDT (#150-80-064)
Nut (#150-80-093)
Head (#150-80-013)
Cup Assembly (see above)
Stirring Hot Plate
(#150-83)
Locking Nut (#150-80-001)