CT80-250
Direct Vent - Installation & Operation Instructions
│
Odyssey
25
Important Warning - It is the responsibility of the installing contractor to ensure that:
1. The boiler and venting system are totally sealed from products of combustion.
2. The homeowner is advised of their responsibility of keeping the vent terminal clear of snow and ice.
3. That the home is equipped with a carbon monoxide detector.
Hose Clamp
Figure 7
-7
Seal with silicone where shown.
Tilt down
after sealing
Vacuum
Breaker
Direct Vent Terminal Installation
Direct Vent
Terminal
Air Inlet Piping
3” Flex (10’)
Hose Clamp
Insulated Flex
Hose Clamp
3” Insulated Flex
to Pipe Adapter
3” Flex (10’)
5” to3”
Ported
Adapter
Seal
Typical Balanced Flue Installation for CT90-120
Secure
using Tabs
Figure 7
-6
Insulated Flex
5” to 3”
Ported Adapter
Smoke
Hood
Step E
Step G
Step D
Step
C
Step B
Seal with silicone where shown.
Step F