04/26/02
21
Revision 1.11
10- Apply power to the Junction Box and verify that all sensors data
streams are present.
11- Turn on the side scan computer (if present). Fine tune Side Scan
Gain on the LCDU if necessary (Setup
menu).
Power-Up procedures are complete at this point. Once on site, or in open
water, the heading sensor should be checked for proper operation.
Multibeam calibration (as described in Section 5) or “Patch Tests” (as
described in the software manual) are normally completed prior to the
survey.
Example Survey System Configuration
The following procedure is only very basic example of system setup when
using
HYPACK for Windows 6.4
HYSWEEP (trademark of Coastal
Oceanographics). The complete and up to date manual may be
downloaded from Coastal’s web page “www.coastalo.com”.
HYPACK
Go to
HYPACK for Windows 6.4 / Preparation
program.
Select
Initialization / File / New
to create a new setup or
/Open
to use one that already exists.
Open Current
if you
want to use the last setup. The “path to save to” is defined
when the file is saved.
ECHOSCAN Setup
1- Under
Initialization
, select
Devices / Add Device
and type a name for
the device such as ECHOSCAN (Do
not
press Enter).
2- Click on
Library
then
Browse,
locate the “echoscn2.dll” driver and
click on
OK
. The box marked “Echo Sounder” should have an “X”.
3- Move the cursor to “Update Frequency” and type in 135 ms (Do
not
press Enter).
4- Click on
Connect
, select a Comm Port (normally 5) and configure for
19200 Baud, 8 bits, 1 stop, no parity, no flow control.
5- Click
OK
to return to the
Devices
Setup
menu then click on
Offsets
.
6- Type in a
Latency
time of 135 ms and click on OK.
7- Click
OK
to close the
Device Setup
window.
Содержание ECHOSCAN
Страница 19: ...04 26 02 19 Revision 1 11 Blanking aeration Figure 17 Blanking Feature...
Страница 38: ...04 26 02 38 Revision 1 11 EXTENDER CABLE WIRING...
Страница 39: ...04 26 02 39 Revision 1 11 TRANSDUCER CABLES...
Страница 40: ...04 26 02 40 Revision 1 11...
Страница 41: ...04 26 02 41 Revision 1 11...
Страница 42: ...04 26 02 42 Revision 1 11 JUNCTION BOX WIRING...
Страница 43: ...04 26 02 43 Revision 1 11...
Страница 44: ...04 26 02 44 Revision 1 11 HEADING SENSOR WIRING...