Solar Flair 14" Tubular Skylight
I n s t a l l a t i o n I n s t r u c t i o n s
For cathedral ceiling installation,
use steps listed below, referring to
those listed on previous pages for
specific details.
Disregard step 2.
• Cut holes in roof and ceiling.
• Install flashing to roof deck.
• Install adjustable tube into flashing.
Adjust this tube until it
protrudes through the ceiling
equally on all sides.
• Mark tube flush at ceiling.
Remove and cut tube on the line.
• Install trim ring.
• Install white tube ring seal to
adjustable tube and slide into
flashing.
• Press adjustable tube into
trim ring.
• Install dome.
• Install diffuser
CATHEDRAL
CEILING
INSTALLATION
For long shaft installation, use steps listed below,
referring to those listed on previous pages for
specific details.
• Locate and install top adjustable tube, trim ring,
and lower adjustable tube.
• Frame 2 x 4 between joists. Span from roof to
ceiling with a length of 2 x 4 flat to outside of
each adjustable tube as a spine.
• Put a #6 x 1” pan-head, sheet metal screw (not
included) in each connecting extension.
• Slide next piece in and screw. Continue until all
but one extension is connected. Cut and install
last section.
• Tape ALL joints. Return to Step 1.
LONG
SHAFT
INSTALLATION
7
If your tube shaft
is longer than 6’,
support the shaft
as indicated in
illustration.
CEILING
ROOF DECK
CEILING
2 x 4 SUPPORT
ROOF DECK
1” OVERLAP