10
3. GETTING STARTED
3.1. Unpack and check the contents of the box.
Scope of delivery
V 80 SE
4 power tubes with tube layout diagram
Power cord (3-core cable with 3-pin plug)
Remote control
2 screwdrivers:
1 x 3 mm flat-bladed screwdriver for adjusting the bias
1 x 2 mm Allen key for removing the cover
Owner's manual with warranty card
Содержание V 80 SE
Страница 1: ...V 80 SE Owner s Manual English ...
Страница 14: ...15 3 GETTING STARTED 3 7 Connection possibilities overview ...
Страница 47: ...48 ...