LED INSET THRESHOLD/END LIGHT L
THE04
INSTRUCTION MANUAL FOR USE, INSTALLATION AND MAINTENANCE
STEP A
B
ACTIVITY DESCRIPTION
the sealer while it begins to dry up.
ATTENTION: avoid starting the installation when the ambient temperature is
below 10°C (86°F), unless the sealer used is designed to dry up at a lower
temperature.
8
Push the base into the recess until its upper side is at the level of the
pavement surface; take care no sealer flowing inside the base. Align the notch
of the base with the markings on the pavement surface.
9
/
Observing the circular level fixed on the jig, level the jig by operating the three
leveling lobe knobs (Figure 13). If necessary, a weight may be placed on the jig
to hold the light base in position.
The remainder of the space between the sides of the shallow base and the
drilled hole should be filled with sealer up to approx 25 mm from the
pavement, according to the local needs.
Fill the remaining 25 mm with a suitable joint sealing filler.
10
/
Observing the circular level fixed on the jig, level the jig by operating the three
leveling lobe knobs (Figure 13). If necessary, a weight may be placed on the jig
to hold the light base in position.
When the shallow base is in its final position, the conduit(s) must be properly
jointed to the hole(s) provided on the shallow base. This(these)
provided either on the wall either on the bottom, the number and
dimensions according to customer requirements (
Figure 12).
The remainder of the space between the sides of the shallow base and the
drilled hole should be filled with sealer up to approx 25 mm from the
pavement, according to the local needs.
Fill the remaining 25 mm with a suitable joint sealing filler.
11
/
Lay the secondary power cable, equipped with a suitable two-pole receptacle
kit, and the grounding wire inside the cable duct.