EN-1
2
IV. INSTALLATION
BEFORE OPERATION
Before using your new device, please read the following instructions
carefully: they contain important information regarding safety, installation,
operation and maintenance.
Keep this manual in a safe place; you may need it later.
Upon receipt, check that the device is not damaged. Damage due to
transport must be notified to your supplier before using your freezer.
Remove the packaging. Clean the inside of the device with lukewarm
water and a non-aggressive, fragrance-free product. Rinse with clean
water and dry (see cleaning chapter). Use a soft cloth.
If the freezer has been stored in a cold environment (below +5°C), it will
need an adaptation period of at least 1 hour before switching it on.
If the freezer has been transported on its side, leave it upright for 12
hours before switching it on.
Setting up
IMPORTANT: The installation of this unit requires the intervention of
several people.
For reasons of safety and operation, the device must not be
placed outdoors.
Place the device horizontally on a flat and stable floor, in a dry and well-
ventilated room (max. 75% relative humidity).
Never place the appliance near heat sources such as stoves or radiators,
and avoid placing it in direct sunlight or near any other heat sources.
Содержание OCEACCF99W3
Страница 1: ...C Cong lateur coffre 99L Chest freezer 99L OCEACCF99W3...
Страница 52: ...OCEACCF99W3_IM_FR EN_102023...