manualshive.com logo in svg
background image

 EOS SERVICE PROCEDURE 12-2810-R02 (10/3/10) 

 

SUPPORT:
TOLL‐FREE:

800‐435‐3483
|
FAX:

510‐569‐5404
|
EMAIL:

[email protected]

                      

 8

 

 

5.

 

Lubricate
and
carefully
work
the


Valve
Housing
O‐ring
(29)


onto
the
plastic
portion
of
the


Valve
Housing
(
)


tube


until
seated
into
the
groove.


6.

 

If
the


Demand
Lever
(28)


was
removed,
reinstall
by
holding
the


Valve
Housing
(27
or
44)


with
the
small
flat
molded


onto
the
plastic
part
of
the
housing
tube
facing
upwards.
Carefully
insert
one
leg
of
the


Demand
Lever
(28)


without


excessively
bending
it
into
the
square
broached
hole
on
one
side
of
the


Valve
Housing
(27
or
44)


tube


(Fig.
20)

;
pull


the
opposite
leg
of
the


Demand
Lever
(28)


outwards
and
insert
the
end
into
the
square
broached
hole
in
the


opposite
side
of
the


Valve
Housing
(27
or
44)


tube.
The


Demand
Lever
(28)


should
now
rest
on
the
flat
molded
on


top
of
the
housing
tube;
this
will
insure
that
the
square
aspirator
hole
on
one
side
of
the
tube
will
face
the

mouthpiece
opening
inside
the


Housing
(6)

.


7.

 

Lightly
lubricate
and
install
the


Adjustment
Tube
O‐ring
(12)


onto
the
narrow
groove
in
the
middle
of
the


Adjustment
Tube
(11)
(Fig.
21)

.


8.

 

Lightly
lubricate
and
install
a
new


Balance
Shaft
O‐ring
(13)


into
the
small
opening
of
the


Adjustment
Tube
(11)


by


pressing
it
into
place
with
the
narrow
end
of
the


Poppet
(31)


shaft.
Remove
the


Poppet
(31)


shaft
and
look
into
the


small
opening
of
the


Adjustment
Tube
(11)

;
you
should
be
able
to
see
clear
through.
If
not,
remove
o‐ring
and


reinstall
until
correctly
seated.


9.

 

Inspect
and
install
a
new


Poppet
Seat
(30)


onto
the


Poppet
(31)

,
large
flat
end
facing
out
until
it
is
fully
seated
and


flush
with
the
edge
of
the


Poppet
(31)

(Fig.
22)

.
Examine
the
hole
in
the
center
of
the


Poppet
Seat
(30)


to
insure
that


it

is
clear
and
not
plugged.
Do
not
use
any
adhesive
or
lubricant.







Fig.
22








Fig.
23









Fig.
24


10.

 

Lightly
lubricate
and
install
both


Poppet
O‐rings
(32,
33)


into
the
narrow
grooves
of
the
shaft
of
the


Poppet
(31)

(Fig.


23)

.


11.

 

Insert
the


Poppet
(31)


seat
end
first
into
the
round
opening
of
the


Valve
Housing
(27
or
44)

,
pressing
it
into
place


with
a

cotton
swab
(

Fig.
23)

;
the


Demand
Lever
(28)


should
pop
up
momentarily.
Make
sure
the
side
of
the
poppet


with
4
“fins”
face
downward
to
insure
that
the
poppet
engages
the
legs
of
the


Demand
Lever
(28)

.


NOTE:
When
installing
the
Poppet
(31)
into
the
Valve
Housing
(27
or
44),
it
must
be
orientated
with
the
side
of
the

Poppet
(31)
having
4
fins
facing
down;
the
side
with
2
fins
facing
up
(Fig.
25).
















Fig.
25







Fig.
26







Fig.
27


Содержание EOS

Страница 1: ...FAX 510 569 5404 EMAIL service oceanicusa com 1 EOS PNEUMATICALLY BALANCED SECOND STAGE PRODUCT SERVICE PROCEDURE This Service Procedure conveys a list of components and procedures that reflect the E...

Страница 2: ...lbs Over Purge High flow rate will not stop when air stream is obstructed Opening Effort IP 138 psi 9 5 bar Venturi Switch set negative 1 No leak with Adjustment Knob turned fully out counterclockwise...

Страница 3: ...nd stage 1 Gravel or sand trapped inside Housing 6 2 Excessive Demand Lever 28 slack 1 Remove and clean 2 Readjust Orifice 26 refer to Final Adjustment section Little or no airflow when purge is depre...

Страница 4: ...er 4 and Diaphragm 5 by grasping the raised edges of the center and lift with a slight upward twist to remove Hold up to the light and inspect for holes tears or deformation discard if any found 6 Tur...

Страница 5: ...chedule A Fig 8 16 Slide the Venturi Tube Switch 35 off the Adjustment Tube 11 Remove the Venturi Tube Switch O ring 34 by pinching the o ring and rolling off Fig 9 inspect for any damage and discard...

Страница 6: ...remove the Orifice 26 by turning it counter clockwise in the Valve Housing 27 or 44 until the threads disengage Once the threads are fully disengaged press out the Orifice 26 with a cotton swab Fig 1...

Страница 7: ...fe and could result in serious injury or death 1 If it was removed install a new Exhaust Valve 9 into the Housing 6 by gently pulling the valve stem through the Housing 6 with a hemostat or needle nos...

Страница 8: ...bricate and install a new Balance Shaft O ring 13 into the small opening of the Adjustment Tube 11 by pressing it into place with the narrow end of the Poppet 31 shaft Remove the Poppet 31 shaft and l...

Страница 9: ...g clockwise with an adjustable crows foot wrench attached to a calibrated torque wrench and torque to 25 27 in lbs Fig 29 Fig 28 Fig 29 Fig 30 15 Install the Venturi Tube Switch O ring 34 on the groov...

Страница 10: ...the Adjustment Knob Screw 22 and tighten clockwise attach a 3 32 hex driver to a calibrated torque wrench and torque to 3 4 in lbs Fig 35 24 Carefully examine the knife sealing edge of the Orifice 26...

Страница 11: ...one on each side that fit into the rectangular slots in the threaded portion of the Front Cover Ring 1 Fig 40 Check that the logos are correctly oriented Fig 41 Fig 40 Fig 41 30 Install the Front Cove...

Страница 12: ...e mouthpiece has been removed CAUTION To avoid cutting the Poppet Seat 30 with the knife edge of the Orifice 26 always depress the Front Cover 2 while adjusting the Orifice 26 failure to do so will re...

Страница 13: ...ehelic Gauge and record the Inhalation Effort in Inches Water Column IWC this is also referred to as Cracking Effort Inhalation Effort is not to exceed 1 2 IWC Magnehelic is a registered trademark of...

Страница 14: ...Making sure that all other ports on the first stage are sealed close lightly inhale on the second stage to determine vacuum integrity you should not be able to draw air through the second stage If yo...

Страница 15: ...ervice oceanicusa com 15 SERVICE PARTS KITS P N DESCRIPTION NOTES 40 6166 KIT SVC EOS 2ND STG SWIV DOCUMENTS P N DESCRIPTION NOTES 12 2210 PROCEDURE SVC EOS www OceanicNet com FREE 12 2201 PROCEDURE A...

Страница 16: ...er Price List EOS SECOND STAGE DIA CAT P N DESCRIPTION NOTES 1 c 7083 07 A COVER RING TOP EOS ASSY 2 c 7053 07 COVER TOP EOS 3 c 7046 RING RETAINING DIAPHRAGM 4 b 7045 WASHER DIAPHRAGM 5 b 5236 DIAPHR...

Страница 17: ...EMAND 29 b 2 017 O RING ORDER 2 017K 12 PK b 2 017K O RING 12PK 30 a 5465 SEAT POPPET 31 b 5464 POPPET 32 a 5474 O RING 091 X 036 33 a 5474 O RING 091 X 036 34 b 2 018 O RING ORDER 2 018K 12 PK b 2 01...

Отзывы: