To check the sealing on the injector, turn on the gas, check the bubble generation on
the base of the injector. In order to do this, the related tap shall be opened, the nozzle part of
the injector shall be closed and gas output (with a silicon stick or your finger) shall be
obstructed. If there is a leakage, bubbles shall be generated. Tighten the injector with wrench
no 7.
If the designed and manufactured to allow conversion from LPG to Natural Gas or vice
versa, it shall be provided together with the conversion kit as a spare. After determining the gas
type to be utilized, the required conversion kit shall be connected to the hose connection.
6.4 Speed Settings
For Speed setting, first
remove the button from the
panel. The marked screw in
the picture is the speed setting
screw.
Place the speed screw
driver with fine tip on the
speed screw of the tap you
want to adjust.
Open the tap to maximum
then light the cooker.
Turning the speed screw
clockwise the speed will
decrease; turning it counter
clockwise will increase the
speed.
EN I 23
Содержание OGHF 64 I PRO SV
Страница 1: ...COUNTERTOP BUILT IN COOKER GAS AND ELECTRIC SERVICE MANUAL COOKING HOB OGHF 64 I PRO SV...
Страница 8: ...GAS HOB GROUPS 8 EN...
Страница 28: ...ELECTRIC COOKER GROUPS 28 EN...
Страница 41: ...4a interior black red TERMINAL BLOCK blue 2 brown blue 2 orange orange blue brown 304 board EN I 41...