![OBO Bettermann SLM50 Скачать руководство пользователя страница 7](http://html2.mh-extra.com/html/obo-bettermann/slm50/slm50_mounting-instructions_3176848007.webp)
7 | EN
SLM50 suspended vertical ladders for the maintenance of electrical function
Necessary tools
4 Necessary tools
List of required tools:
– Angle grinder
– Drill
– Linear laser; spirit level
– Wrench set
– Ladder
– Roller scaffolding or work platform
5 System description
The SML50C40F.. vertical ladders, with a max. width of 600 mm, can be
used as standard support structures in the mounting variants, according
to the surveyors' reports, as suspended rising sections for the mainten-
ance of electrical function (E30–E90).
The suspended mounting of the vertical ladder can be performed regard-
less of the structure or type and of the distance to the wall. For this, the
vertical ladders are mounted flush to solid ceiling structures. Depending
on the mounting version, the maximum storey height may not exceed
3.5 m or 7.0 m.
Fig 1:
Overview, mounting variants
No
Mounting variant
Suitable for storey heights
≤ 3 5 m
> 3 5 m – ≤ 7 0 m
Direct ceiling mounting with head plates
Direct ceiling mounting with mounting angles
—
Mounting in a direct run below the ceiling opening with
transverse profiles
Mounting in a direct run below the ceiling opening with
lengthwise profiles
Tab 1:
Overview, mounting variants
Содержание SLM50
Страница 4: ...4 EN OBO Bettermann Table of contents...