![OBO Bettermann SLM50 Скачать руководство пользователя страница 23](http://html2.mh-extra.com/html/obo-bettermann/slm50/slm50_mounting-instructions_3176848023.webp)
23 | EN
SLM50 suspended vertical ladders for the maintenance of electrical function
Mounting vertical ladders up to a max storey height of 7 0 m
6 3 2
Mounting the ladder rails with transverse profiles
1. Draw the drill holes on next to the ceiling openings.
Maintain the min-
imum edge spacing according to the approval of the anchor used.
2. Using a linear laser, transfer the position of the drill holes to the floor.
3. Pre-drill the drill holes. Ø according to anchor type and approval.
Fig 25:
max. 7,0 m
Mounting transverse profiles
4. Mount the U supports in parallel to the vertical ladder, each with 2
M12 anchors.
Fig 26:
x
y
y
Mounting head plates
Note!
The threaded rods must be mounted at a spacing of y – x – y to each
other. x = vertical ladder width – 150 mm; y = 100 mm.
Содержание SLM50
Страница 4: ...4 EN OBO Bettermann Table of contents...