A: Drilling hole in the top for water line connection.
1. Disconnect power by UNPLUGGING unit. It might be necessary to remove
the front panel to get access to the power.
2. Turn OFF water supply to the unit. It might be necessary to remove the
front panel to access the water stop valve.
3. Place hole template onto cooler top so it is aligned with the left side of unit
and wall. SEE NEXT PAGE FOR TEMPLATE
4. Mark hole location
5. Remove top from unit.
Section 3A: Installation
Note: Proceed to Section 3B Step 5 “Final steps for both product families” if
the cooler is purchased “Quasar Bottle Filler or VersaFiller ready”.
5
Template
Mark hole location.
6. Using a step drill bit or 7/8” punch die, make a 7/8” hole through top. You
may want to drill a pilot hole to get these started.
7. Install snap bushing into hole to protect tubing from being cut.
Drill
Install bushing
5
Remove top from cooler by
removing six, #15 torx head screws
on sides of top.