background image

222 East Campus View Blvd.

Columbus, OH  43235

614-861-1350

www.oasiscoolers.com

P/N 030099-601     Date: 10/2019

Accessories:

Vandal resistant screw kit:

P/N 036704-001, includes torx bits and replacement screws.

Gasket, Sunroc/Haws

: P/N 036689-101: (replaces item 2)  KIT P/N 036752-001

Gasket Adapter, Elkay/Halsey Taylor

P/N 041114-001

Oasis and Versacooler are registered trademarks of LVD Acquisition, LLC dba 
Oasis International.                                                                         

Haws is a registered trademark of HAWS Corporation.                                  
Elkay and Halsey Taylor are registered trademarks owned or licensed by Elkay 
Sales Inc. and/or its parent Elkay Manufacturing Company 

© 2019 LVD Acquisition, LLC

27

Section 5: Parts Breakdown continued

OASIS INTERNATIONAL

ITEM QTY P/N

Description

ITEM QTY P/N

Description

1

1

036687-003

FRAME, PWFSBF-K12

28

1

017340-483

LEAD WIRE ASSY BLACK 14"

2

1

036689-001

GASKET, PWSBF

29

1

021929-177

LEAD WIRE ASSY RED 14"

3

1

036686-001

CAP, PWSBF

30

1

041051-001

PCB, UV

4

2

031875-003

SCREW, TRUSS HD TAPPING TORX

31

1

041061-001

CABLE ASSY, 3 WIRE UV LED

5

1

038026-002

ELECTRONICS ASSY, IR/LCD

32

1

041050-002

UVC LED 9C+VISIBLE POD MODULE

6

1

038027-001

LENS, IR BOTTLE FILLER

33

1

030152-009

TUBE, PE WHITE 7.5"

7

4

026824-026

NUT, HEX NYLON

34

2

026642-016

SCREW, HEX HD TAPPING

8

1

031434-014

NAMEPLATE, OASIS

35

1

029962-103

FTG, PP REDUCING ELBOW

9

1

036190-005

ALCOVE, EBF UV LED

36

1

017340-483

LEAD WIRE ASSY BLACK 14"

10

1

036691-007

WRAPPER, PWEBF STN2

37

1

021929-177

LEAD WIRE ASSY RED 14"

11

2

031875-003

SCREW, TRUSS HD TAPPING TORX

38

1

041052-001

POWER ADPTR CABLE,18GA DC

12

1

038031-005

LABEL, LCD BEZEL

39

1

038036-003

POWER SUPPLY,100-240VAC/12VDC

13

1

038031-011

LABEL, PANEL QUASAR

40

1

038168-001

CORD ASSY, DC POWER SUPPLY

14

1

038031-006

LABEL, ALCOVE SENSOR

41

1

036701-001

DRIP TRAY ASSEMBLY

15

2

036049-002

SCREW, OVAL HD PLASTITE

42

1

037059-001           

FILTER HSNG ASSY, 1/4 TRN, SM

16

1

036695-001

TRAY, GRILLE DRIP

43

1

037406-101            

FILTER, REMEDI PAC

17

1

036688-001

TRAY, DRIP PWSBF

44

1

040707P001            

KIT, FILTER HEAD

18

1

036697-001

CAP, DRIP TRAY BOTTOM

45

1

029994-103           

FTG, PP ELBOW, PLUG IN

19

2

026642-023

SCREW, HEX HD TAPPING #8

46

1

030152-158            

TUBE, PE WHITE 52.0"

20

1

027189-001

BUSHING, SNAP

47

1

041071-001            

FILTER CARTRIDGE, VERSAFILTER II

21

1

027189-008

BUSHING, SNAP

48

1

041072-001            

FILTER HEAD, VERSAFILTER II

22

1

029199-103

FTG, PP UNION TEE WHITE

49

1

041073-001              

BRKT, VERSAFILTER II

23

1

036191-002

DRAIN, MSBF, SHORT

50

4

026630-022             

SCREW, PAN HD TAPPING

24

1

017681-008-SP INSULATION, SPONGE TUBE 19"

51

2

029994-103           

FTG, PP ELBOW, PLUG IN

25

1

030152-046-SP TUBE, PE WHITE 38"

52

1

030152-046-SP           

TUBE, PE WHITE 38.0"

26

2

038030-002

SOLENOID VALVE 12VDC

53

1

030152-157            

TUBE, PE WHITE 21.0"

27

1

026642-023

SCREW, HEX HD TAPPING

Содержание Quasar PG8EBQ

Страница 1: ...f the cooler electrical outlet does not have two useable plugs an outlet splitter will need to be used If installed onto a refrigerated cooler chilled water can be dispensed through the Bottle Filler...

Страница 2: ...ps screw driver 15 torx bit driver 38 of OD plastic tubing with 19 of sponge tubing insulation included with Quasar Bottle Filler ready coolers What s Included Tools required Section 1 Getting Started...

Страница 3: ...Oasis PWEBQ Versacooler II Models PAC P8AC with Hands Free Bottle Filler Section 2 Rough In Drawing 3...

Страница 4: ...s PWEBQ Versacooler II Split Level Models with Hands Free Bottle Filler Section 2 Rough In Drawing On split level models the Bottle Filler must be mounted on the low unit in order to meet ADA guidelin...

Страница 5: ...nd wall SEE NEXT PAGE FOR TEMPLATE 4 Mark hole location 5 Remove top from unit Section 3A Installation Note Proceed to Section 3B Step 5 Final steps for both product families if the cooler is purchase...

Страница 6: ...E THIS TEMPLATE TO MARK THE HOLE LOCATION ON COOLER TOP 3 1 4 from edge of paper 2 1 8 from edge of paper Mark this center point on the top Remove the top from the cooler Then create a 7 8 diameter ho...

Страница 7: ...7 VersaCooler to Quasar Bottle Filler Plumbing Diagram OPTIONAL VERSAFILTER II OPTIONAL FILTER BOTTLE FILLER SOLENOID VALVE UV LED VERSACOOLER INLINE STRAINER TUBE AND REDUCER FTG PROVIDED WITH FOUNTA...

Страница 8: ...olers to Quasar Bottle Filler Plumbing Diagram BOTTLE FILLER SOLENOID VALVE UV LED OPTIONAL VERSAFILTER II OPTIONAL FILTER VERSACOOLER VERSACOOLER T FITTING INLINE STRAINER TUBE AND REDUCER FTG PROVID...

Страница 9: ...ld water from the cooling tank to the Bottle Filler OD tube to connect to Versafiller Note If you are retrofitting the Bottle Filler to an existing cooler follow the instructions starting on page 11 F...

Страница 10: ...f the tee will connect to the Bottle Filler If a filter is being installed cut a piece of tubing about 3 long to insert optional flow switch right after filter and before tee This allows Bottle Filler...

Страница 11: ...tank is non pressurized then go to the Pressurizing the cooling tank addendum section Otherwise proceed to step 1 below Non pressurized units are single units made since December of 2009 Refer to the...

Страница 12: ...anch of the TEE Connect the other end of the TEE to the tank outlet tubing tube that was disconnected from the elbow 32 tubing 6 tubing 4 Route the TEE and tubing under the waste drain and connect the...

Страница 13: ...e with a tubing cutter Cut where there is at least 1 inch of straight tubing on each side of the cut 4 Install TEE fitting by connecting the copper tubing to each end Then install the 32 piece of plas...

Страница 14: ...al steps for both product families 14 5 Feed tube up through the top and attach the top to the cooler TIP For the P8AM it is easier to connect the outlet tube to the bubbler if the front nose is remov...

Страница 15: ...push it against the wall and mark hole locations for wall fasteners The gasket will set the frame at the proper height Use mounting slots that will provide the proper securing location Make sure to p...

Страница 16: ...lation over water line Connect the tubing to the INLET of the solenoid on the back of the Hands free Bottle Filler assembly Connect tube to inlet of the valve Plastic tubing Section 3C Installation Sp...

Страница 17: ...nstallation 17 Attach the tether line assembled to the bottle filler dispense bracket to the cleat on the mounting frame 1 2 3 4 Push loop through hole Put loop around one side of the cleat Pull loop...

Страница 18: ...er cabinet is set into place feed the terminals on the power supply power cord and the long green ground wire through the bushing on the cooler top 7 Connect male terminals on the bottle filler power...

Страница 19: ...fits into the groove in the rubber gasket on both sides and front of the wrapper Bottle Filler cabinet Groove in the gasket Section 3 Installation 19 See next page to secure Bottle Filler assembly to...

Страница 20: ...efer to the program guide on next page for further programming Access programing Pushbutton through top of Bottle Filler 12 Turn ON water supply and check for leaks Place a container in the alcove to...

Страница 21: ...included on all models SELECT RATE 1 2 GPMUNIT To change flow rate momentarily depress button to change whole gallon digit Hold button 3 seconds to advance to TENTHS of gallon digit Depress momentaril...

Страница 22: ...nlet quick connect elbow located left side of water valve facing the front of the cooler Set tubing aside careful to not contaminate water contact end Unplug tubing from quick connect elbow leading to...

Страница 23: ...leading to the cooling tank from step 2 STEP 3 STEP 4 Unplug tubing that is connected to the water valve outlet quick connect elbow located on the right side of valve facing the cooler STEP 5 Connect...

Страница 24: ...ow on the right side of the valve be sure to route the tubing under existing tubing installed in step 4 as shown Step 8 Using tubing that is connected to the quick connect elbow left side of valve don...

Страница 25: ...25 Section 5 Parts Breakdown...

Страница 26: ...26 Section 5 Parts Breakdown...

Страница 27: ...014 NAMEPLATE OASIS 35 1 029962 103 FTG PP REDUCING ELBOW 9 1 036190 005 ALCOVE EBF UV LED 36 1 017340 483 LEAD WIRE ASSY BLACK 14 10 1 036691 007 WRAPPER PWEBF STN2 37 1 021929 177 LEAD WIRE ASSY RED...

Отзывы: