
5
Installation Instructions
Prior to installing the ozone generator, ensure that you have all of the required parts listed
on page 1. Some parts, such as the mounting clip, may have been factory assembled or pre-
installed. No tools are required to install the ozone generator or any of its components.
step 1:
Position mounting clip over the
injector cap and press down until the clip
clicks into place over the cap. Ensure that
the sliding bracket on the clip is facing
away from the controller body.
Note: Pull up on the large tab to unlock
and remove the clip from the injector
cap.
step 2:
Mount ozone generator box by
sliding it onto the mounting clip.
step 3:
Install nut, clear ferrule, and
black ferrule on the tube connected to the
generator box.
Note: Parts must be installed on the
tube in the orientation shown above.
Removing stiffener from end of tube may
aid in installation of ferrules. Be sure
to re-install stiffener in the end of tube
when finished.
Nut
Clear Ferrule
Black Ferrule
step 4:
Remove and set aside the
existing air-draw elbow by pulling out the
red clip and lifting up on the elbow.
step 5:
Install the new air-draw elbow
by pushing it down into the port and
inserting the red clip until it clicks.