STARTING THE TANK
VIDEO INSTRUCTIONS FOR PUTTING
INTO OPERATION
STEP 1: REEF CONSTRUCTION AND SAND:
•
We recommend to arrange the aqua scape whilst dry,
before filling the aquarium with seawater. This is sig-
nificantly easier than arranging the reef construction
underwater.
•
When the aqua scape is finished, the sand can be added.
STEP 2: FILLING WITH SEAWATER
•
Before filling for the first time, make sure all technical
components (skimmer, return pump, etc.) are installed in
compliance with the manufacturer’s safety instructions.
•
The Auto Top Off system is only required once the aqua-
rium is in operation. We therefore recommend that the
refill tank be initially removed.
•
Check the correct installation of the pipework once more.
First fully connect the valve by turning clockwise. Fill the
overflow box with a little water to test the leak-tightness
of the threaded connections on the overflow box.
•
Fully open the valve before filling the main tank by tur-
ning it counterclockwise.
•
Now start to fill the display tank with seawater.
20
Содержание OPUS 300
Страница 1: ...OPUS 300 INSTRUCTIONS...
Страница 4: ...SAFETY INSTRUCTIONS 4 Fig 1...
Страница 26: ...EXPLODED DRAWING 26 6 7 1 2 3 4 5 27 30 31 32 8 9 10 11 12 13 14 15 20 24 25 21 26 22 23 33 27 28 29...
Страница 34: ...NOTES 34...
Страница 35: ...NOTES 35 EN...