Lock
nut
Note: For junction
boxes with a
through hole,
use provided lock
nut (Item K).
Note: Ensure junction box is in proper orientation and
tighten to pipe mounting bracket (Item C). In some
cases, it may be required to install the junction box
in the 3 o'clock or 9 o'clock position on the pipe.
• Slip green/yellow tube (item F)
over braid and shrink.
1/2 in
1/2 in
5 1/2 in
• While tube is still hot, pinch with pliers between
bus wires to seal; hold for 10 seconds.
• Starting at center of tube, move heat source
continuously from side to side.
1 1/
2"
• Slide grommet until end is 1 1/2"
from end of outer jacket
• Bring cable into
junction box
• Hand tighten nut
• With channel lock
pliers tighten nut, but
do not exceed more
than one (1) turn.
1
2
3
4
5
6
7
8
9
0
CAUTION: Health Hazard. Consult
included material safety data sheet.
CAUTION: Health Hazard. Consult
included material safety data sheet.
CAUTION: To avoid burns allow heated
sections to cool before touching.
4 | nVent.com
11
12
13
15
14
16