~8~
~9~
STEP 5 : COOLING UNIT INSTALLATION
GET HELP
BEFORE INSTALLING AND KEEP CHILDREN CLEAR OF CELLAR CONSTRUCTION AREA.
Get helper to help guide unit, keep light cord clear of edge inside cellar and to prevent tipping of cellar.
MAKE
SURE INSULATION STRIP IS IN CORRECT ORIENTATION
. Run light cord through Cut-out. Slide unit into the back
opening by angling unit
A
to allow light cord to clear and straighten to push in
B
. Screw allen bolts (
I)
through
bottom fl ange holes. Make sure unit is level!
1
I
D
NOTE:
If unit is operated according to specifi cations overfl ows will not occur. Excess
condensation is only caused by extreme conditions. Unit will shut off at 72 °F and will
restart when temperature drops or unit is repluged. (In this case insert 3/8” O.D. hose
to drain hole, cut to appropriate length.)
Container
Optional (not required)
except as emergency
drain.
CORD MUST
CLEAR OPENING
A
B
SIDE VIEW
DO NOT!!!
KEEP UNIT LEVEL
INSIDE CELLAR
INSULATION
STRIP
CHECK
LEVEL TO
OPENING
STRAIGHTEN AND
PUSH THROUGH
GET HELPER TO
LIFT UNIT LEVEL
AND PULL FROM
INSIDE
(I) x2 Flange
bolts in
cooling unit
box.
SHELF
DO NOT OVER
TIGHTEN