~8~
~9~
STEP 4 : SHELVES
Open box VP4S or VP4D
Hook
SHELVES
into hangers start-
ing from the bottom of cabinet, (12
shelves on cooling unit side, 14 on
the other) alternating the two sides
HINT :
CENTER SHELVES ON HANGERS
1
2
Snap
SHELVES
into
hangers on one side
Push the
SHELVES
down to snap into op-
posite side hangers
3
3
1
2
PRESS
BOTTOM
TOP
1
2
Install
COUPLER SHELVES
between
the
VERTICAL COUPLER
and the
BACK PANEL
, hook them on the
COUPLER HANGERS
(G)
Install 4
HANGERS STRIPS,
hook-
ing them to the
COUPLER SHELVES
through square holes. (Watch for
orientation, all hooks have to point
upwards).
NOTE :
Assure that each of them is
hooked to all 4 shelves
1
2
COUPLER SHELVES
VERTICAL COUPLER
G